Submittals that don't stall the buy.

Live · 14-day free trial

Every submittal sits in a register by spec section, with who has it and when it's due. Because it's linked to schedule activities, you can see which approvals are holding up the work before they hold up the schedule. Linking to subcontracts is planned.

The problem today

How it gets done now

Spreadsheets and disconnected tools, each holding part of the same number.

  1. 01

    The register is a spreadsheet built from the spec at buyout and updated by hand.

  2. 02

    Reviews go out by email; status depends on who last remembered to update the log.

  3. 03

    Procurement doesn't know a submittal came back approved until someone forwards it.

  4. 04

    At closeout, approved product data is hunted down for the O&M manuals.

How it works on one record

One entry. Everything downstream already knows.

On os.construction the record is shared, not synced. Here is everything Submittal 23 33 00-04 touches, the moment it changes.

One recordSubmittal 23 33 00-04Fire damper product data · for CO #14Summit Mechanical
  1. RegisterSpec section, rev and due dateRev 0
  2. ReviewArchitect, ball-in-court trackedIn review
  3. CommitmentSummit Mechanical CCO-03 cleared to buyOn approval
  4. CloseoutApproved data filed for O&M manualsKept

Sample data · Riverside Medical Center, Job #24-118. An in-browser sketch on sample data, not a screenshot of the app.

What you get

What's live and what's planned

2 of 5 are live in the app today. Preview items work with the limits noted. Planned items are not built yet, and the founding cohort helps set the order. See the platform →

  • Live

    Submittal register

    Items by spec section with revisions, due dates and required-by dates.

  • Live

    Review workflow

    Ball-in-court from sub to GC to design team and back, with every response kept.

  • Planned

    Linked to commitments

    See which subcontracts and POs are waiting on an approval.

  • Preview

    Look-ahead tie-in

    Submittals link to schedule activities today. Required-by dates driven from the three-week look-ahead are next.

  • Planned

    Closeout packages

    Approved product data assembled for O&M manuals.

FAQ

Straight answers.

Can it build the register from the spec?

We're looking at how to speed up register setup from spec sections. Until that ships, the register can be imported from the spreadsheet you build at buyout.

Who can see submittal status?

Everyone on the job with access to the project, including the sub that submitted it, so nobody has to ask where a submittal is.

How is this different from a PM tool's submittal log?

The log itself is familiar. The difference is that it sits on the same project record as the specs, drawings and schedule. Linking each submittal to the commitment it releases, so buyers and payers see approvals too, is planned.

Can I use it today?

Yes. Submittals are live in the app. Start a 14-day free trial.

Try it on a real project.

Start a 14-day free trial. Want a say in what ships next? Join the founding program.

Your role (optional)

14-day free trial. Pricing for paid plans isn't set yet. Talk to us. Already have an account? Sign in →

Open file