Three-way match

Definition

An AP control that checks an invoice against its purchase order and the receiving record before payment is approved.

Topic: Accounting & WIP

Updated

Three-way match of PO-118, the receipt and INV-4471The purchase order with 42,050 dollars remaining, the delivery receipt and invoice INV-4471 for 48,200 dollars are compared line by line. Panelboards, transformers and freight match. 6,150 dollars of conduit fittings are not on the purchase order, so the invoice is held until a PO change is approved.PO-118$42,050Receiptall qtyINV-4471$48,200Compare linesMatch3 lines$42,050Exceptionfittings$6,150Held until PO changethen approved
Illustrative. The receipt shows everything arrived, so the gap is scope, not a short shipment.

A three-way match compares three documents before an invoice is paid: the purchase order (what you agreed to buy and at what price), the receiving record or delivery ticket (what actually showed up), and the vendor invoice (what you’re being asked to pay). If quantities and prices line up within tolerance, the invoice moves to payment. If not, it goes to someone to resolve.

How it works

  1. Purchase order. A PO is issued with line items, quantities and unit prices, and becomes a commitment.
  2. Receipt. When material arrives, someone at the site checks it against the delivery ticket and records what was received, including short or damaged items.
  3. Invoice. The vendor’s invoice is entered and linked to the PO.
  4. Compare. The system, or AP, compares each invoice line with the PO line (item and unit price) and the receipt (quantity received).
  5. Apply tolerance. Differences within the agreed tolerance pass. Anything larger becomes an exception.
  6. Resolve. Exceptions go to the PM or buyer, who approves a PO change, records a missing receipt or asks the vendor for a credit.
  7. Approve and pay. Matched invoices go on for approval and into the next payment run.

The same idea is used in US federal contracting, where FAR 32.905 bases payment on a proper invoice and requires a receiving report or other government documentation authorizing payment.

Worked example

INV-4471 bills $48,200 against PO-118 on Riverside Medical Center. The PO has $42,050 remaining. Delivery tickets confirm the full quantity was received, so the $6,150 gap is a price or scope issue, not a short shipment. The invoice is held until the PO is revised or the vendor issues a credit. (Illustrative sample data.)

Illustrative (sample data) of the line-level match:

Line PO remaining Received Invoiced Result
Panelboards, 4 at $4,800 $19,200 4 $19,200 Match
Transformers, 2 at $9,850 $19,700 2 $19,700 Match
Freight $3,150 n/a $3,150 Match
Conduit fittings not on PO Received $6,150 Exception
Total $42,050 $48,200 Held

The PM confirms the fittings were ordered on site to finish added conduit runs. The buyer adds a $6,150 line to PO-118 by PO change, the match passes, and the invoice goes on for approval. Without the change, the vendor would be asked to issue a credit for the fittings or bill them separately once a PO exists.

Check Compares Catches
Two-way match Invoice and PO Price and quantity above what was ordered
Three-way match Invoice, PO and receipt The above, plus goods billed but not received
Four-way match Adds inspection or acceptance Goods received but rejected
Pay app review Pay app, schedule of values and field progress Billing ahead of work on subcontracts
Duplicate check Invoice against earlier invoices The same bill entered twice

Why it matters

It stops the most common AP leaks: paying for material that never arrived, paying a higher unit price than agreed, and paying the same invoice twice. In construction, where deliveries land at a jobsite and paperwork lands at the office, the receiving record is often the weak link.

It also supports segregation of duties. The person who orders, the person who receives and the person who pays each produce one of the three documents, so a fake or inflated invoice needs more than one person to get through. The match result and how each exception was resolved belong in the audit trail.

Common mistakes

  • Skipping the receiving step because the field never sends delivery tickets back to the office.
  • Setting tolerances so loose that real overcharges pass through.
  • Applying it to subcontract pay apps, which need a different check: percent complete against the schedule of values, plus lien waivers.
  • Letting the person who approves the PO change also approve the invoice it fixes, with no second look.
  • Receiving the full PO quantity in the system when only part of the order arrived.
  • Overriding exceptions to pay on time without recording the reason.

How os.construction handles it

The Accounting AP app compares supported bills with commitment lines and approved changes, and purchase-order lines with receipts. Review mismatches, field progress and compliance evidence before independent approval and payment release. See Accounts payable.

FAQ

What is a three-way match?

It's an accounts payable control that compares three documents before an invoice is paid: the purchase order, the receiving record or delivery ticket, and the vendor's invoice. If item, quantity and price agree within tolerance, the invoice can be approved. If not, it's held as an exception.

What is the difference between a two-way and a three-way match?

A two-way match compares only the invoice with the purchase order, checking price and quantity ordered. A three-way match adds the receiving record, so you also confirm the goods actually arrived. A four-way match adds an inspection or acceptance record, confirming what arrived was acceptable.

What is a match tolerance?

It's the difference the system accepts without holding the invoice, usually set as a percentage, a fixed amount, or both, such as small freight or rounding differences. Tolerances save time on trivial variances but should be tight enough that real overcharges are caught.

Does three-way match apply to subcontractor pay applications?

Not directly. A subcontract pay app bills percent complete against a schedule of values, not quantities delivered against a PO. The equivalent check is that the percent complete agrees with the project manager's view of work in place, that approved change orders support any added value, and that waivers and insurance are current.

What happens when an invoice fails the match?

It's held and routed to whoever can resolve it, often the project manager or buyer. The fix might be a PO change if extra items were approved, a receipt entry if the field didn't record a delivery, or a credit memo from the vendor if the price or quantity is wrong.