Construction accounting, job cost and WIP
Construction accounting differs from ordinary bookkeeping in one way that matters: revenue is earned as the work progresses, so the books depend on an honest estimate of the cost to finish every job.
The terms here run from the ledger (chart of accounts, journal entries, subledgers, close) through job cost (cost codes, commitments, accruals, labor burden, overhead) to the forecast and revenue side (estimate at completion, cost-to-cost percent complete, earned revenue, over and under billing, the WIP schedule).
Read the guide: Construction cost reporting: accruals, earned revenue, EAC and WIP
Accounting & WIP: terms defined
Job costing
Tracking every dollar of labor, material, equipment and subcontract cost against the specific job and cost code it belongs to.
AccountingCost code
A code that classifies a cost by type of work, and usually by cost type, so budgets and actuals can be compared at a useful level of detail.
AccountingCSI MasterFormat
The Construction Specifications Institute's standard numbering system that organizes specifications into divisions like 03 Concrete and 26 Electrical.
AccountingCommitment
A contractual obligation to spend money, such as a subcontract or purchase order, tracked against the budget before any invoice arrives.
AccountingPurchase order
A document issued to a supplier that authorizes a purchase of materials, equipment or services at agreed quantities and prices.
AccountingPurchase Requisition
An internal request to buy something, with what is needed, why, the cost code and an estimate, approved before a purchase order is issued.
AccountingThree-way match
An AP control that checks an invoice against its purchase order and the receiving record before payment is approved.
AccountingAccrual
Recording a cost (or revenue) in the period it was incurred or earned, even if the invoice hasn't arrived or the cash hasn't moved.
AccountingReversing entry
A journal entry that exactly mirrors an earlier one, swapping debits and credits, to cancel it or to undo an accrual in the next period.
AccountingLabor burden
The cost of employing a worker beyond base wage: payroll taxes, workers' comp, insurance and benefits, as a percent or per-hour add-on.
AccountingEquipment costing
Charging owned or rented equipment to jobs at rates that recover its full cost of ownership and operation.
AccountingOverhead
Company-level costs not tied to any one job, such as office rent, executives, accounting and IT, paid for out of jobs' gross profit.
AccountingOverhead allocation
Spreading indirect costs, such as shop, yard or equipment overhead, to jobs on a base like labor hours, labor cost or direct cost.
AccountingGeneral conditions
In construction, either the contract document that sets the parties' general rights and duties (such as AIA A201), or the job-specific costs of running the site that aren't tied to one trade: staff, field office, temporary facilities and cleanup.
AnalyticsCost report
A job report showing, by cost code, the original and revised budget, committed cost, actual cost, cost-to-complete, forecast and variance.
AnalyticsCost-to-complete
The estimated remaining cost to finish a job, based on remaining commitments, remaining labor and known risks, not just budget minus actuals.
AnalyticsEstimate at completion
The forecast total cost of a job when finished: cost to date plus estimated cost to complete.
AnalyticsMargin fade
A decline in a job's projected gross profit margin over time, from bid to forecast to final.
AccountingGross profit
Contract revenue minus direct job costs; for a contractor, the margin a job contributes before company overhead.
AnalyticsPercent complete (cost-to-cost)
A job's progress measured as cost incurred to date divided by total estimated cost; the most common basis for recognizing contract revenue.
AccountingCost-to-cost method
Measuring a contract's progress as cost incurred to date divided by estimated total cost, then recognizing that percentage of the contract price as revenue.
AccountingEarned revenue
The portion of contract value a contractor has earned to date, typically percent complete times total contract value.
AccountingRevenue Recognition (ASC 606)
The accounting rules for when and how much revenue to record. Under ASC 606, most construction contracts recognize revenue over time as work progresses.
AccountingASC 606
The US GAAP standard for revenue from contracts with customers, which governs how contractors recognize revenue over time on construction contracts.
AccountingVariable consideration
Parts of a contract price that can change, such as unapproved change orders, claims, incentives, shared savings and liquidated damages, included in revenue only when a significant reversal is not probable.
AccountingUninstalled materials
Materials delivered to or stored for a job but not yet installed; under ASC 606 they can be excluded from cost-to-cost progress and recognized at zero margin.
AccountingCompleted-Contract Method
An accounting method that recognizes all revenue and profit on a contract only when the job is complete, holding costs and billings on the balance sheet until then.
AccountingIRC §460
The Internal Revenue Code section that sets tax accounting methods for long-term contracts, requiring percentage of completion except for qualifying small contractors and home or residential construction.
AccountingLoss provision
On a contract expected to lose money, the immediate recognition of the full anticipated loss, not just the share of it incurred so far.
AccountingContract asset
Under ASC 606, revenue you have earned on a contract but not yet billed: in construction, the underbilling, or costs and estimated earnings in excess of billings.
AccountingContract liability
Under ASC 606, amounts billed or received before the revenue is earned: in construction, the overbilling, or billings in excess of costs and estimated earnings.
AnalyticsWIP schedule
A monthly report that compares each open job's earned revenue to its billings to show over billing, under billing and projected profit.
BillingOver billing
When billings to date exceed revenue earned to date on a job; recorded as a liability called billings in excess of costs and estimated earnings.
BillingUnder billing
When revenue earned to date exceeds billings to date; recorded as an asset called costs and estimated earnings in excess of billings.
AnalyticsBacklog
Contracted revenue not yet earned: the work a contractor has signed but not yet performed.
AccountingGeneral ledger
The complete record of every financial transaction a company posts, organized by account, from which the trial balance and financial statements are built.
AccountingChart of accounts
The numbered list of every account a company posts to, grouped into assets, liabilities, equity, revenue and expenses.
AccountingJournal entry
A dated, balanced record of a transaction, listing the accounts debited and credited, which posts to the general ledger.
AccountingDouble-entry accounting
The bookkeeping system in which every transaction is recorded as equal debits and credits, so the books always balance.
AccountingSubledger
A detailed ledger, such as AP, AR, retainage or job cost, whose total ties to a control account in the general ledger.
AccountingControl account
A general ledger account whose balance must equal the total of a subledger, such as accounts payable or accounts receivable.
AccountingTrial balance
A list of every account's debit or credit balance at a date; total debits equal total credits.
AccountingAccounts payable
Money your company owes to subcontractors, suppliers and vendors for work, materials and services already billed.
AccountingAccounts receivable
Money owners and clients owe your company for work you've billed, including retainage held until completion.
AccountingAging report
A report that groups open receivables or payables by how long they've been outstanding, such as current, 1–30, 31–60, 61–90 and over 90 days.
AccountingPayment run
A batch process that selects approved bills due for payment, applies holds, gets release approval, and produces checks or electronic payments.
AccountingPositive pay
A fraud control in which you send your bank a list of issued checks, and the bank pays only checks that match it.
AccountingACH (NACHA) file
The fixed-format file your bank accepts to send electronic payments through the ACH network, such as vendor payments and payroll direct deposit.
AccountingBank reconciliation
Proving that the cash balance in your books agrees with the bank statement, after accounting for deposits in transit and outstanding checks.
AccountingRetainage payable
Retainage you have withheld from subcontractors' pay apps, owed to them once release conditions are met.
AccountingRetainage receivable
Retainage the owner has withheld from your pay applications: billed and earned, but not collectible until release.
AccountingCash-basis accounting
Recording revenue when cash is received and expenses when cash is paid, rather than when they are earned or incurred.
AccountingFiscal period
A defined slice of the fiscal year, usually a month, that entries post into and that can be opened, soft-closed or closed.
AccountingMonth-end close
The process of finishing a period's accounting: reconciling, accruing, reviewing and locking the month so its numbers stop changing.
AccountingRetained earnings
The cumulative profits a company has kept rather than distributed, increased each year by the closing entry that moves net income into equity.
AccountingDepreciation
Spreading the cost of a long-lived asset, such as construction equipment, over the years it is used, as an expense each period.
AccountingMACRS
The Modified Accelerated Cost Recovery System, the US tax depreciation method that assigns assets to recovery periods and depreciates them on IRS percentage tables.
AccountingUse tax
Tax you owe your state on taxable purchases when the seller didn't charge sales tax, commonly on out-of-state material purchases.
AccountingIntercompany transaction
A transaction between two legal entities in the same group, such as an equipment company billing an operating company, recorded in both entities' books with due-to and due-from balances.
AccountingConsolidation
Combining the financial statements of several entities into one set for the group, eliminating intercompany balances and transactions.
AccountingJoint venture accounting
How a contractor reports its share of a construction joint venture, typically by proportionate consolidation or the equity method.
AccountingSegregation of duties
Splitting key steps of a transaction, such as entering, approving, paying and reconciling, between different people so no one person can both commit and conceal an error or fraud.
TechnologyAudit Trail
A permanent, time-stamped record of who created, changed or approved each piece of data, and what it was before.
AccountingBuyout Savings
The difference between a trade's budgeted cost and the actual amount committed at buyout, positive when the subcontract or PO comes in under budget.
Tools, templates and guides
Lessons and videos
Articles
- Certified payroll and the WH-347: a contractor's guide Nov 18, 2026
- Direct vs indirect costs in construction: job cost, general conditions and overhead Nov 18, 2026
- Earned value vs percent complete: one measures progress, the other tells you what it means Nov 18, 2026
- Hard costs vs soft costs in construction: what goes where, and why it matters Nov 18, 2026
- How to build a 13-week cash flow forecast for a construction company Nov 18, 2026
- How to build a construction cash flow projection: from the cost curve to the month you're lowest Nov 18, 2026
- How to calculate general conditions costs: build them from the schedule, not a percentage Nov 18, 2026
- How to calculate construction overhead and markup for a bid Nov 18, 2026
- How to calculate retainage, and how to get it released Nov 18, 2026