Field operations: daily logs, submittals, inspections and punch

The field generates most of a project's records: what happened each day, what was asked and answered, what was submitted and approved, what was inspected and what is left to fix.

Kept well, these records settle disputes and support billing. The terms below cover daily logs and T&M tickets, RFIs, submittals and transmittals, meeting minutes and ball-in-court tracking, permits and inspections, punch lists and as-builts.

Field operations: terms defined

Field

Daily Log

The superintendent's dated record of each day on site: weather, manpower, work performed, deliveries, inspections, visitors, delays and issues.

Field

Time and Materials Ticket (T&M Ticket)

A daily field record of labor hours, materials and equipment used on extra work, signed by the other party as backup for payment.

Field

Field Order

A written order issued in the field directing a contractor to do specific work right away, usually minor, with price and time settled afterward if needed.

Project management

Request for Information (RFI)

A formal written question from the contractor to the design team asking them to clarify, fill a gap in, or resolve a conflict in the contract documents.

Project management

Submittal

Shop drawings, product data, samples or other documents a contractor sends to the design team for review before buying or installing materials.

Project management

Submittal Register

The master list of every submittal a project requires, with spec section, responsible sub, required dates and review status.

Project management

Transmittal

A cover record that lists exactly which documents, drawings or samples were sent, to whom, when, how and for what purpose.

Project management

Ball in Court

Who has to act next on an RFI, submittal, punch item or other open record, so the item never waits without an owner.

Project management

Meeting Minutes

The written record of a project meeting: who attended, what was decided on each topic, who owns each open item and by when.

Project management

Look-Ahead Schedule

A short-range schedule, usually two to six weeks, that breaks the master schedule into the specific tasks crews will perform next.

Project management

Weekly Work Plan

The set of commitments each trade makes for the coming week in the Last Planner System, drawn from make-ready work in the lookahead and assessed at the end of the week.

Field

Building Permit

Written permission from the local building authority to construct, alter or demolish a building, issued after plan review and subject to inspections and conditions.

Field

Inspection Checklist

A list of items checked before work is covered or accepted, answered pass, fail or not applicable, so quality checks are the same every time.

Field

Punch List

The list of incomplete or defective items that must be fixed before the owner accepts the work and final payment is released.

Field

As-Built Drawings

Drawings marked up to show how the project was actually built, including every field change from the original design.

Technology

Building Information Modeling (BIM)

A process of creating and managing a shared 3D model of a building that carries data about its parts, not just geometry.

Field

Field Mode (Offline Sync)

A way to keep a schedule on a phone, record progress on site without signal, and sync the updates as one new version when the connection returns.