RFI or Submittal? 🚪 One Door, Two Jobs
One door, two different records: clarify conflicting frame dimensions with an RFI, and submit the proposed frame package for review.
An animated teaching example with AI narration. The illustrations explain the process; they are not a recording of the app.
Video transcript
Two drawings show different frame widths for the same door. Would sending a product sheet answer that question?
Use an RFI to ask which width applies. Include the door location, both drawing references, and the specific conflict.
A submittal serves a different purpose: send the proposed frame product data and shop drawing for review against project requirements.
If the package depends on that clarification, link the records and flag the unresolved question. Follow the project review procedure.
Clarify the requirement; review the proposal. Keep the next action clear. Find the RFI guide at os dot construction.