Getting paid: pay applications, retainage and lien rights
Contractors are paid in arrears, monthly, against a schedule of values, with part of every payment held back as retainage. The pay application is the request; lien waivers and notices are how each tier protects its right to be paid.
The terms below follow the money: billing the work (SOV, G702/G703, stored materials), what gets held back (retainage and its release), and the paperwork that preserves or gives up lien rights (preliminary notices, conditional and unconditional waivers, stop payment notices, mechanics liens).
Read the guide: Getting paid: pay apps, retainage, lien waivers and notices
Payment & liens: terms defined
Pay Application (Pay App)
A contractor's periodic, itemized request for payment based on work completed and materials stored against the schedule of values.
BillingAIA G702
The AIA Application and Certificate for Payment: the one-page summary of a pay application, signed by the contractor and certified by the architect.
BillingAIA G703
The AIA Continuation Sheet: the line-by-line detail of a pay application, showing progress and retainage for each schedule of values item.
BillingSchedule of Values (SOV)
The breakdown of the contract sum into line items with assigned values, used as the basis for progress billing.
BillingMobilization
The work and cost of getting people, equipment, temporary facilities and permits in place on site so construction can start, often billed as its own line on the schedule of values.
BillingStored Materials
Materials delivered and stored on site or in an approved off-site location but not yet installed, which may be billed if the contract allows.
BillingRetainage
A percentage of each progress payment that the owner (or GC) holds back until the work is substantially or finally complete.
BillingRetainage Release
Billing and paying out the retainage held on a contract, usually at substantial or final completion, once the contractual conditions are met.
AccountingRetainage receivable
Retainage the owner has withheld from your pay applications: billed and earned, but not collectible until release.
AccountingRetainage payable
Retainage you have withheld from subcontractors' pay apps, owed to them once release conditions are met.
ContractsPay-When-Paid
A subcontract clause that sets the timing of sub payment to follow the GC's receipt of payment from the owner.
BillingJoint Check
A check made payable to two parties, typically a subcontractor and its supplier, so the supplier gets paid and lien risk is reduced.
BillingLien Waiver
A document in which a contractor, sub or supplier gives up its right to file a mechanics lien for a stated amount or period, usually in exchange for payment.
BillingConditional Lien Waiver
A lien waiver that only takes effect once the stated payment is actually received and clears.
BillingUnconditional Lien Waiver
A lien waiver that takes effect immediately on signing, confirming payment has already been received for the stated amount.
BillingPreliminary Notice
A notice a sub or supplier sends early in a job to preserve its lien rights, telling the owner and GC it is furnishing labor or materials.
ContractsNotice of Commencement (NOC)
A recorded public notice that identifies a private construction project, its owner, contractor and lender, and anchors lien deadlines and priority in states that use it.
ContractsNotice of Nonpayment
A written notice an unpaid subcontractor or supplier sends to preserve a payment bond claim or warn the owner and GC that it hasn't been paid; deadlines are set by state law.
ContractsStop Payment Notice
A claim served on an owner or construction lender that requires them to withhold enough undisbursed project funds to cover an unpaid sub or supplier.
BillingMechanics Lien
A legal claim against a property filed by an unpaid contractor, subcontractor or supplier who improved it.
ContractsNotice of Completion
A recorded notice that a private project is complete, which in many states shortens the deadline for contractors, subs and suppliers to record mechanics liens.
BillingOver billing
When billings to date exceed revenue earned to date on a job; recorded as a liability called billings in excess of costs and estimated earnings.
BillingUnder billing
When revenue earned to date exceeds billings to date; recorded as an asset called costs and estimated earnings in excess of billings.
Tools, templates and guides
Articles
- How to bill stored materials on a pay application, and move them to installed Nov 18, 2026
- How to build a 13-week cash flow forecast for a construction company Nov 18, 2026
- How to build a construction cash flow projection: from the cost curve to the month you're lowest Nov 18, 2026
- How to calculate retainage, and how to get it released Nov 18, 2026
- How to fill out a G702/G703 pay application, line by line Nov 18, 2026
- How to price a change order: labor, material, subs and markup, worked line by line Nov 18, 2026
- How to read the payment terms in a construction contract: a clause-by-clause checklist Nov 18, 2026
- How to review a subcontractor pay application before you approve it Nov 18, 2026
- Pay-when-paid vs pay-if-paid: who carries the risk when the owner doesn't pay Nov 18, 2026