Changes, RFIs and claims: from question to change order
Most scope changes start as a question from the field. The answer arrives as an RFI response, an architect's supplemental instruction or a bulletin, and if it changes cost or time it becomes a change event, a potential change order and finally a change order or construction change directive.
When the parties don't agree, the same records become the evidence: T&M tickets, back charges, constructive change and delay claims, time impact analysis and acceleration.
Read the guide: From RFI to change order: ASI, field order, CCD and CO
Changes & claims: terms defined
Request for Information (RFI)
A formal written question from the contractor to the design team asking them to clarify, fill a gap in, or resolve a conflict in the contract documents.
Project managementArchitect's Supplemental Instructions (ASI)
AIA G710 Architect's Supplemental Instructions (ASI): the architect's written instruction that clarifies the contract documents or orders a minor change with no change in contract sum or time.
Project managementBulletin
A package of revised drawings and specifications the design team issues during construction, often with a request to price the changes.
FieldField Order
A written order issued in the field directing a contractor to do specific work right away, usually minor, with price and time settled afterward if needed.
Project managementChange Event
Any occurrence on a project that might change cost, scope or schedule, logged before anyone knows whether it will become a change order.
Project managementPotential Change Order (PCO)
A priced proposal for a change, submitted to the owner for approval before it becomes an executed change order.
ContractsConstruction Change Directive (CCD)
A written order from the owner directing a change in the work before owner and contractor agree on price or time.
Project managementChange Order (CO)
A signed agreement between owner and contractor that changes the contract scope, price, time, or a combination of them.
ContractsConstructive Change
A change to the work the owner causes through words or conduct without issuing a formal change order, which can still entitle the contractor to more time or money.
ContractsDiffering Site Conditions
Physical conditions at the site that differ materially from the contract documents or from what's normally encountered, entitling the contractor to an adjustment.
FieldTime and Materials Ticket (T&M Ticket)
A daily field record of labor hours, materials and equipment used on extra work, signed by the other party as backup for payment.
AccountingBack charge
A charge a contractor issues to a subcontractor or supplier for costs it incurred because of their defective work, damage, cleanup or failure to perform.
ContractsDelay Claim
A documented request for contractual relief associated with delay, supported by records, schedule analysis, and the applicable contract.
Project managementAcceleration
Speeding up work to finish earlier than the current schedule allows, either because the owner directs it or because the owner denies a time extension the contractor was owed.
Project managementTime Impact Analysis
A schedule modeling method that inserts an event into a selected schedule and compares the calculated milestone dates.
Project managementProspective Time Impact Analysis
A forward-looking time impact analysis, done near the time of a delay event, that inserts an agreed fragnet into the current schedule update to estimate its effect on completion.
Project managementWindows Analysis
A retrospective delay analysis that measures how the forecast completion moved in each period between consecutive schedule updates, and why.
Project managementPacing
A deliberate slowing of non-critical work in response to a delay on another path, so it isn't counted as concurrent delay.
Tools, templates and guides
Lessons and videos
Articles
- AIA A201 vs ConsensusDocs 200: how the two standard contract families differ Nov 18, 2026
- How to handle a differing site condition: the first 48 hours Nov 18, 2026
- How to price a change order: labor, material, subs and markup, worked line by line Nov 18, 2026
- How to write an RFI that gets answered the first time Nov 18, 2026
- AIA G710 vs G714 vs G701: which form for which change Nov 17, 2026
- Back charges: how to issue, dispute and document them Nov 17, 2026
- Submittal vs RFI: which one to send, and why it matters Nov 17, 2026
- Markup vs margin: the pricing mistake hiding in your change orders Nov 3, 2026
- Field to ledger: why daily logs are financial documents Oct 30, 2026