Topic · 18 terms

Changes, RFIs and claims: from question to change order

Most scope changes start as a question from the field. The answer arrives as an RFI response, an architect's supplemental instruction or a bulletin, and if it changes cost or time it becomes a change event, a potential change order and finally a change order or construction change directive.

When the parties don't agree, the same records become the evidence: T&M tickets, back charges, constructive change and delay claims, time impact analysis and acceleration.

Read the guide: From RFI to change order: ASI, field order, CCD and CO

Changes & claims: terms defined

Project management

Request for Information (RFI)

A formal written question from the contractor to the design team asking them to clarify, fill a gap in, or resolve a conflict in the contract documents.

Project management

Architect's Supplemental Instructions (ASI)

AIA G710 Architect's Supplemental Instructions (ASI): the architect's written instruction that clarifies the contract documents or orders a minor change with no change in contract sum or time.

Project management

Bulletin

A package of revised drawings and specifications the design team issues during construction, often with a request to price the changes.

Field

Field Order

A written order issued in the field directing a contractor to do specific work right away, usually minor, with price and time settled afterward if needed.

Project management

Change Event

Any occurrence on a project that might change cost, scope or schedule, logged before anyone knows whether it will become a change order.

Project management

Potential Change Order (PCO)

A priced proposal for a change, submitted to the owner for approval before it becomes an executed change order.

Contracts

Construction Change Directive (CCD)

A written order from the owner directing a change in the work before owner and contractor agree on price or time.

Project management

Change Order (CO)

A signed agreement between owner and contractor that changes the contract scope, price, time, or a combination of them.

Contracts

Constructive Change

A change to the work the owner causes through words or conduct without issuing a formal change order, which can still entitle the contractor to more time or money.

Contracts

Differing Site Conditions

Physical conditions at the site that differ materially from the contract documents or from what's normally encountered, entitling the contractor to an adjustment.

Field

Time and Materials Ticket (T&M Ticket)

A daily field record of labor hours, materials and equipment used on extra work, signed by the other party as backup for payment.

Accounting

Back charge

A charge a contractor issues to a subcontractor or supplier for costs it incurred because of their defective work, damage, cleanup or failure to perform.

Contracts

Delay Claim

A documented request for contractual relief associated with delay, supported by records, schedule analysis, and the applicable contract.

Project management

Acceleration

Speeding up work to finish earlier than the current schedule allows, either because the owner directs it or because the owner denies a time extension the contractor was owed.

Project management

Time Impact Analysis

A schedule modeling method that inserts an event into a selected schedule and compares the calculated milestone dates.

Project management

Prospective Time Impact Analysis

A forward-looking time impact analysis, done near the time of a delay event, that inserts an agreed fragnet into the current schedule update to estimate its effect on completion.

Project management

Windows Analysis

A retrospective delay analysis that measures how the forecast completion moved in each period between consecutive schedule updates, and why.

Project management

Pacing

A deliberate slowing of non-critical work in response to a delay on another path, so it isn't counted as concurrent delay.