Esc

↑↓ move↵ openIndex · Pagefind
Topic · 14 terms

Construction technology and data terms

Choosing construction software means meeting a second vocabulary: how systems share data (APIs, webhooks, change feeds), how they stay trustworthy (audit trails, row-level security, a single source of truth) and how newer tools fit in (AI agents with a human in the loop, the Model Context Protocol).

Read the guide: Why one data core

Technology & data: terms defined

Technology

ERP (Enterprise Resource Planning)

Software that runs a company's core business processes, like accounting, payroll, purchasing and job cost, on one database.

Technology

Single Source of Truth (Data Core)

One authoritative record for each piece of data, so every team and report reads the same number instead of copies.

Technology

API (Application Programming Interface)

A defined way for software systems to request and exchange data with each other without manual export and import.

Technology

Webhook

An automatic message one system sends to a URL you choose the moment a specific event happens, like a change order being approved.

Technology

Change Feed

A running, newest-first list of what happened to a shared record, such as a schedule's saves, calculations, baselines, imports and discussion, with who did it and what changed.

Technology

Semantic Layer (Metric Catalog)

A governed list of business metrics, each defined once with its formula, unit and allowed groupings, that every dashboard and query reads from.

Technology

Audit Trail

A permanent, time-stamped record of who created, changed or approved each piece of data, and what it was before.

Technology

Row-Level Security

Filtering data row by row so each person sees only the records they're allowed to see, in every report and query.

Technology

OCR (Optical Character Recognition)

Technology that reads text from scanned documents, PDFs and photos and turns it into data software can use.

Technology

Building Information Modeling (BIM)

A process of creating and managing a shared 3D model of a building that carries data about its parts, not just geometry.

Technology

Digital Twin

A digital model of a physical asset or project that stays connected to real-world data, so it reflects current conditions.

Technology

AI Agent

Software that uses an AI model to carry out multi-step tasks, like reading documents, checking data and drafting actions, toward a goal.

Technology

Human-in-the-Loop

A design where automated or AI systems propose actions, and a person reviews and approves them before they take effect.

Technology

Model Context Protocol (MCP)

An open protocol that lets an AI application discover and call tools and read data from other systems through a standard connector.

Open file