Topic · 20 terms

Preconstruction, estimating, bidding and buyout

Preconstruction turns drawings into a price and a plan: quantity takeoff, estimating, risk and contingency, subcontractor prequalification and bid leveling, then buyout once the job is won.

The sales side has its own vocabulary too. Pipeline value, weighted pipeline, win rate and quote hit rate tell a contractor whether there is enough work coming to keep crews busy.

Read the guide: From bidding to an awarded commitment

Preconstruction & bidding: terms defined

Project management

Preconstruction

The planning phase before construction starts, when the builder estimates, prices, sequences and buys out the work so the project can be built for the budget and schedule the owner expects.

Project management

Takeoff

The process of measuring and counting quantities of materials and work from drawings to build an estimate.

Accounting

CSI MasterFormat

The Construction Specifications Institute's standard numbering system that organizes specifications into divisions like 03 Concrete and 26 Electrical.

Project management

Three-Point Estimate

An activity duration given as optimistic, most likely and pessimistic values, used to describe uncertainty for schedule risk analysis.

Project management

Risk Register

A list of identified project risk events, each with an owner, probability, impact and mitigation, that can feed a quantitative schedule risk analysis.

Project management

Value Engineering (VE)

A structured review of a design to lower cost or improve value without reducing required function, quality or performance.

Contracts

RFP vs. RFQ

An RFQ asks contractors to submit qualifications so the owner can shortlist; an RFP asks for a proposal with approach and often price. In trade buying, RFQ can also mean request for quotation.

Project management

Prequalification

Screening contractors or subcontractors on safety, finances, experience and capacity before they're allowed to bid.

Contracts

Bid Bond

A surety bond submitted with a bid that guarantees the bidder will sign the contract and provide performance and payment bonds if awarded.

Project management

Bid Leveling

Comparing subcontractor bids line by line, adjusting for scope gaps and exclusions, so they can be judged on equal terms.

Project management

Buyout

The process after award of turning the estimate into signed subcontracts and purchase orders, locking in actual costs and scope for each trade.

Accounting

Buyout Savings

The difference between a trade's budgeted cost and the actual amount committed at buyout, positive when the subcontract or PO comes in under budget.

Analytics

Pipeline Value

The total estimated value of every open pursuit: work you're chasing that hasn't been won or lost yet.

Analytics

Weighted Pipeline

The sum of each open pursuit's estimated value multiplied by its probability of winning: a probability-weighted forecast of new work.

Analytics

Win Rate

Pursuits won divided by pursuits decided (won plus lost). Open pursuits are left out.

Analytics

Quote Hit Rate

Of the quotes a vendor submits, the share that win: quotes awarded divided by quotes received.

Analytics

Lead Conversion Rate

The share of incoming inquiries that become real pursuits: inquiries converted to an opportunity divided by inquiries received.

Analytics

Average Deal Size

Total value of won pursuits divided by the number won: the typical size of the work you actually land.

Analytics

Sales Cycle

How long a pursuit takes from first entry to a win, averaged over won pursuits.

Analytics

Backlog

Contracted revenue not yet earned: the work a contractor has signed but not yet performed.

Open file