Construction bonds and insurance
Bonds and insurance are how owners and general contractors make sure a job gets finished and everyone gets paid even when a party fails. A bond is a three-party promise backed by a surety; insurance pays for covered losses.
These terms show up together at bid time (bid bond, prequalification), at contract award (performance and payment bonds, certificates of insurance, additional insured endorsements) and whenever something goes wrong (indemnity, subrogation, default insurance).
Read the guide: Bid, performance and payment bonds, explained
Bonds & insurance: terms defined
Bid Bond
A surety bond submitted with a bid that guarantees the bidder will sign the contract and provide performance and payment bonds if awarded.
ContractsPerformance Bond
A surety bond that guarantees the contractor will complete the work according to the contract, or the surety will step in.
ContractsPayment Bond
A surety bond that guarantees the contractor will pay its subcontractors, laborers and suppliers on the project.
ContractsSurety
The company that issues construction bonds, guaranteeing to the owner that the contractor will perform and pay, and expecting the contractor to repay any loss.
AccountingBonding capacity
The maximum single-job and total work-on-hand a surety will bond for a contractor, based mainly on its financial strength and track record.
ContractsIndemnity Agreement
A promise by one party to cover another's losses. In surety, the general indemnity agreement makes the contractor and its owners repay the surety for any bond loss.
Project managementPrequalification
Screening contractors or subcontractors on safety, finances, experience and capacity before they're allowed to bid.
ContractsSubcontractor Default Insurance (SDI)
A policy bought by a general contractor that reimburses it for the costs when an enrolled subcontractor fails to perform.
ContractsCertificate of Insurance (COI)
A one-page summary, usually on an ACORD 25 form, that shows a contractor's insurance coverages, limits and policy dates.
ContractsAdditional Insured
A party, like the GC or owner, added to someone else's liability policy by endorsement so that policy defends and covers them for claims arising from that party's work.
ContractsWaiver of Subrogation
An agreement that an insurer, after paying a claim, won't sue the other contracting party to recover what it paid.
ContractsWrap-Up Insurance (OCIP / CCIP)
A single insurance program that covers the owner, GC and enrolled subcontractors for a project, bought by the owner (OCIP) or the contractor (CCIP).