A contractor's financial statements are read for one thing: can this company finish its work and pay its bills? Check the CPA's report level and date, then working capital, the over and under billings, retainage, the gross margin trend, leverage and the notes, and tie the balance sheet to the WIP schedule. Here is the order, with a worked balance sheet.

Charley Forey7 min readAccountingBondingFinance
On this page
  1. Step 1: Check the report level and the date
  2. Step 2: Find the construction lines on the balance sheet
  3. Step 3: Calculate working capital, then adjust it
  4. Step 4: Test the over and under billings
  5. Step 5: Read the income statement for trend, not just profit
  6. Step 6: Check leverage and debt
  7. Step 7: Read the notes and supplementary schedules
  8. Step 8: Tie the balance sheet to the WIP
  9. Worked example: reading a balance sheet
  10. Common mistakes
  11. How os.construction handles it
  12. FAQ

To read a contractor’s financial statements, start with the accountant’s report and the date, then check working capital, the over and under billings, retainage on both sides, the gross margin trend, leverage and the notes, and finally tie the balance sheet to the WIP schedule. You’re looking for one answer: can this company finish the work it has and pay the people it owes?

Three groups read these statements most closely. A surety uses them to set bonding capacity. A bank uses them to set a credit line and its covenants. An owner or owner’s representative uses them to prequalify a general contractor. Controllers read them the same way, because it’s how everyone else will read theirs.

Not underwriting or accounting adviceEvery surety, lender and owner has its own methods and thresholds. The checks below are common ground. Your CPA and surety agent are the right people to ask how your statements are assessed.

Step 1: Check the report level and the date

Read the accountant’s report before the numbers. Under US professional standards, there are three common levels:

  • Audit. The CPA tests the records and gives an opinion, with reasonable assurance, on whether the statements are fairly presented.
  • Review. Limited assurance, mostly from inquiry and analytical procedures.
  • Compilation or preparation. No assurance. The CPA presents management’s numbers.

Many sureties and lenders ask for a reviewed or audited statement once a company reaches a certain size; ask yours what it requires. Then check the date. A year-end statement can be many months old by the time you read it, and a contractor’s position can change quickly. Ask for interim statements and a current WIP if the year-end is stale.

Also check the basis. Most bonded contractors report on an accrual basis using a percentage-of-completion method for revenue, and a statement on a tax or cash basis is harder to compare. Percentage of completion vs completed contract explains the difference.

Step 2: Find the construction lines on the balance sheet

A contractor’s balance sheet has lines most other businesses don’t:

  • Contract receivables, usually including retainage receivable. The notes or a schedule should split out retainage and show how much is past due.
  • Costs and estimated earnings in excess of billings, the underbilling, presented as a contract asset.
  • Accounts payable, usually including retainage payable to subcontractors.
  • Billings in excess of costs and estimated earnings, the overbilling, presented as a contract liability.

Over and under billings come from the WIP schedule. Over billing vs under billing explains what each one means for a job.

Step 3: Calculate working capital, then adjust it

working capital = current assets − current liabilities

Working capital is the cushion that pays bills while jobs are in progress, and it is often the starting point for a surety’s view of capacity. Readers then adjust it. Common adjustments include removing receivables more than 90 days old, related-party and officer receivables and prepaid expenses, but treatment varies by surety and lender. The bonding capacity calculator lets you try the adjustments and multiples yourself.

Step 4: Test the over and under billings

Two quick checks:

  • Cash against overbillings. Overbillings are cash collected for work not yet done. If overbillings are larger than cash, the company may have spent money it still owes in work.
  • Underbillings against working capital. Underbillings are revenue not yet billed. A large balance can be legitimate, such as an approved change order waiting for the next pay app, or a sign of costs that will never be billed. Ask which.

What sureties look for in your WIP goes deeper into both.

Step 5: Read the income statement for trend, not just profit

Look at revenue, gross profit, general and administrative expense and net income, ideally across three years. Questions to ask:

  • Is the gross margin steady, rising or falling?
  • Did revenue grow faster than working capital and equity? Fast growth on a thin balance sheet strains cash.
  • Is overhead growing faster than revenue?
  • Are there one-time items, such as an equipment sale gain, propping up the year?

The completed contracts schedule, if included, shows how jobs actually finished compared with the margin expected. Persistent fade between estimate and result is a warning about estimating, project control or both. See margin fade.

Step 6: Check leverage and debt

debt-to-equity = total liabilities ÷ total equity

Read the notes on debt: the line of credit limit and how much is drawn, the maturity dates, and the covenants. A line that is fully drawn at year end, or a covenant the company barely met, tells you more than the ratio does. Also look for shareholder loans, and whether they are subordinated, because sureties may treat subordinated loans as equity.

Step 7: Read the notes and supplementary schedules

The notes are where the risks are disclosed. Look for:

  • Contracts in progress and completed contracts schedules, which should tie to the balance sheet.
  • Backlog, if disclosed, and its expected margin.
  • Related-party transactions, such as rent paid to the owners or receivables from affiliates.
  • Contingencies, including claims, litigation and disputed change orders.
  • Concentrations, such as one customer making up a large share of revenue.
  • Subsequent events after the balance sheet date.

Step 8: Tie the balance sheet to the WIP

The over and under billings on the WIP schedule should equal the contract assets and liabilities on the balance sheet at the same date, and the WIP’s revenue and cost should support the income statement. If they don’t tie, ask why before relying on either. How to prepare a WIP schedule shows how those numbers are built, and the anatomy of a WIP schedule explainer walks the columns.

Worked example: reading a balance sheet

Illustrative numbersA made-up contractor. The adjustments shown are examples of common ones, not any surety’s rules.
Current assets Current liabilities
Cash $1,150,000 Accounts payable (incl. $520,000 retainage) $2,450,000
Contract receivables (incl. $640,000 retainage) $3,280,000 Billings in excess (overbillings) $780,000
Costs in excess (underbillings) $410,000 Accrued expenses $290,000
Prepaid and other $160,000 Current portion of long-term debt $180,000
Total $5,000,000 Total $3,700,000

Below the current sections: equipment, net, of $1,400,000 and long-term debt of $620,000. Revenue for the year was $18,600,000, gross profit $1,860,000 and general and administrative expense $1,302,000.

Current assets against current liabilitiesCurrent assets of 5.0 million dollars: cash 1.15 million, receivables 3.28 million, underbillings 410,000 and prepaid 160,000. Current liabilities of 3.7 million: payables 2.45 million, overbillings 780,000, accrued 290,000 and current debt 180,000. The 1.3 million difference is working capital.CASH 1,150RECEIVABLES 3,280UNDERBILLED 410PAYABLES 2,450OVERBILLED 780WORKINGCAPITAL 1,300CURRENT ASSETS 5,000CURRENT LIABILITIES 3,700
Working capital is the gap between the two columns. Amounts in thousands. Illustrative.

The calculations.

working capital = $5,000,000 − $3,700,000 = $1,300,000

current ratio = $5,000,000 ÷ $3,700,000 = 1.35

total liabilities = $3,700,000 + $620,000 = $4,320,000

total assets = $5,000,000 + $1,400,000 = $6,400,000

equity = $6,400,000 − $4,320,000 = $2,080,000

debt-to-equity = $4,320,000 ÷ $2,080,000 = 2.08

gross margin = $1,860,000 ÷ $18,600,000 = 10.0%

operating income = $1,860,000 − $1,302,000 = $558,000, or 3.0% of revenue

The adjustments. The receivables schedule shows $230,000 more than 90 days old. Removing that and the $160,000 of prepaid expenses gives:

adjusted working capital = $1,300,000 − $230,000 − $160,000 = $910,000

The billing checks. Cash of $1,150,000 covers overbillings of $780,000, leaving $370,000. Underbillings of $410,000 are 31.5% of unadjusted working capital ($410,000 ÷ $1,300,000), large enough that a reader will ask what’s in them. If most of it is one job’s unapproved change orders, that’s a collection risk, not a timing difference.

What a careful reader concludes. The company is profitable and liquid, but its adjusted working capital is about 30% smaller than the headline figure, and nearly a third of its working capital depends on unbilled revenue. The questions for the contractor: what’s in the old receivables and the underbillings, how much of the line of credit was drawn at year end, and does the WIP tie to these balances?

Common mistakes

  • Reading the numbers before the report, and treating a compilation like an audit.
  • Relying on a stale year-end without interim statements or a current WIP.
  • Counting all receivables as good, including old or related-party balances.
  • Ignoring the underbillings, the line most likely to hide unrecoverable cost.
  • Looking at one year’s profit instead of the margin trend and the completed-job fade.
  • Skipping the notes, where the claims, covenants and related parties are disclosed.
  • Not tying the WIP to the balance sheet.

How os.construction handles it

The Accounting module’s Financial Reports include a balance sheet, comparative income statements, an indirect cash flow statement and an equity roll-forward, along with aging and job profitability reports. The WIP schedule, completed contracts with gross profit against the original estimate and a backlog roll-forward read posted WIP snapshots, and a WIP to GL reconciliation flags differences with the ledger, as described in job cost and WIP. os.construction does not prepare CPA reports or set bonding limits; check the format your surety, lender or CPA requires. For background, see the construction bonds explainer, the WIP calculator, performance bond vs payment bond, and construction WIP software. Owners prequalifying a contractor may also find how to prequalify subcontractors useful, since the same financial questions apply one tier down.

FAQ

What should you look at first in a contractor's financial statements?

The accountant's report and the date. An audit, a review and a compilation give very different levels of assurance, and a statement from many months ago may not describe the company today. Then look at working capital, the over and under billings, and whether the gross margin is holding.

What is working capital for a contractor?

Current assets minus current liabilities. For a contractor, current assets usually include cash, contract receivables with retainage, and underbillings; current liabilities include payables with retainage, overbillings, accrued expenses and the current portion of debt. Sureties and lenders often adjust it by removing assets they don't fully count.

What are costs and estimated earnings in excess of billings?

It's the underbilling, also called a contract asset under ASC 606: revenue recognized on contracts in progress that hasn't been billed yet. The opposite, billings in excess of costs and estimated earnings, is the overbilling, a contract liability.

What is the difference between an audit, a review and a compilation?

In an audit the CPA gathers evidence and gives an opinion with reasonable assurance that the statements are free of material misstatement. A review gives limited assurance, mainly from inquiry and analytical procedures. A compilation or preparation engagement gives no assurance. Sureties and lenders decide which they require.

Can an owner ask a general contractor for financial statements?

Owners often ask for them during prequalification, especially on larger or private work, and some contractors provide them only under a confidentiality agreement or through their surety. Whether you can require them depends on the procurement rules and the contract. A bond from an acceptable surety is another form of financial assurance.

Share this article

Written by

Charley Forey

Founder of os.construction. We're building the operating system for construction. Project Financials follows job money, and company Accounting covers the books and controls. AI agents remain planned. We write about how money and data actually move on a job, and we build in public.

Apply to the founding program →Start a free trial →
Keep readingAll articles →
Open file