Articles tagged Accounting
Cash flow on a construction job: why profitable jobs run out of money
A job can earn a healthy margin and still drain your bank account for months. Profit is an accounting result; cash is timing. Here's how the pay app cycle, retainage and payment terms open a cash gap on every job, and how to see it coming.
Certified payroll and the WH-347: a contractor's guide
On Davis-Bacon work, every contractor and subcontractor submits a certified payroll for each week covered work is performed, signed under a Statement of Compliance. Here's who has to file, what changed on the revised WH-347, how to fill in each column, a worked example with fringe credit and overtime that ties, and the mistakes that get payments withheld.
Direct vs indirect costs in construction: job cost, general conditions and overhead
Direct costs can be traced to a specific job or piece of work. Indirect costs support the work without belonging to one item: the job's general conditions and the company's overhead. Here is how to draw the line, how each gets recovered, a worked estimate and the coding mistakes that distort margins.
How to build a 13-week cash flow forecast for a construction company
A 13-week cash forecast lists every receipt and payment the company expects, week by week, starting from the cash actually in the bank. Date receipts by when each owner really pays, date payments by payroll, terms and pay-when-paid, set a minimum balance, and roll it forward every week against what happened. Here is each step and a worked 13-week example with a low week.
How to calculate construction overhead and markup for a bid
Your markup has one job: recover company overhead and leave the profit you planned. To set it, you need an annual overhead budget, a realistic revenue volume, a profit target, and the margin-to-markup conversion most estimators get wrong. Here's the method step by step, with a worked bid and what happens to the number when volume drops.
How to calculate retainage, and how to get it released
Retainage is a percentage of each progress payment held back until the job is done. The math is simple until a reduction kicks in, stored materials carry a different rate, or the owner releases it less a punch list holdback. Here is the formula, a six-month worked example, the release billing, and how it flows down to subcontractors.
How to close the month in construction accounting: a step list from cutoff to lock
A construction month-end close gets every cost and every billing into the right month, proves cash and the subledgers against the ledger, updates the WIP schedule from current cost-to-complete, has someone else review it, and then locks the period. Here is the step list, an example close calendar and a worked example of what one late invoice does to WIP.
How to fill out a G702/G703 pay application, line by line
A G702/G703-style pay application is two pages that have to agree: a continuation sheet that bills each schedule of values line, and a summary that turns those totals into the payment due. Here is how to fill in every column and line, a worked example that ties, and the checks that stop it coming back.
How to prepare a WIP schedule, step by step
A work-in-progress schedule turns four numbers per job into earned revenue, gross profit and over or under billing. Here's the month-end procedure in order, from cost cutoff to the journal entry, with a three-job percentage-of-completion example that ties out and the review questions that catch a bad forecast.
How to read a contractor's financial statements: the lines a surety, lender or owner's rep checks first
A contractor's financial statements are read for one thing: can this company finish its work and pay its bills? Check the CPA's report level and date, then working capital, the over and under billings, retainage, the gross margin trend, leverage and the notes, and tie the balance sheet to the WIP schedule. Here is the order, with a worked balance sheet.
Construction job costing: how to set up cost codes
A cost code list decides what your job cost report can tell you. Too coarse and overruns hide; too fine and the field codes everything to the first line on the list. Here's how to structure codes and cost types, when to follow CSI MasterFormat and when to build your own, a worked tenant improvement budget, and the rules that keep coding clean.
Schedule of values vs budget: billing lines and cost codes are not the same thing
The schedule of values splits the contract price into lines the owner pays against. The budget splits expected cost into cost codes the contractor manages against. Here is how they differ, why they shouldn't be the same list, how to map one to the other, a worked example and the mistakes that hide over-billing.
Back charges: how to issue, dispute and document them
A back charge is a deduction a contractor takes from a subcontractor or supplier for cost they caused. It sticks when the subcontract allows it, notice and a chance to cure came first, and the cost is documented. Here is how to issue one, how to dispute one, and the paper trail both sides need.
Labor burden: the number behind every bid
A carpenter who earns $36 an hour costs you a lot more than $36 an hour. Labor burden is the gap, and if your estimate, your job cost and your T&M rates each use a different version of it, you're losing money in at least one of them. Here's how to build the number.
Percentage of completion vs completed contract method: how contractors recognize revenue
The percentage of completion method recognizes contract revenue as the work progresses; the completed contract method waits until the job is done. Here is how each one works, where each is allowed for books and for tax, a worked example on one job and the mistakes that distort a contractor's results.
What sureties look for in your WIP
Your surety reads the WIP schedule to answer one question: will this contractor finish its work and pay its bills? Here's what an underwriter checks, the patterns that cost you bonding capacity, and how to hand over a WIP that answers the questions before they're asked.
Your first accounting cycle: setup, transactions and close
A practical learning path through the Accounting module's apps, with the people, evidence and review gates needed from opening balances to month-end.
Markup vs margin: the pricing mistake hiding in your change orders
Add 20% to cost and you don't make 20%. You make 16.7%. The gap between markup and margin is small on one change order and expensive across a year of them. Here's the math, where it bites, and how to price changes so the number you quote is the number you keep.
Field to ledger: why daily logs are financial documents
The daily log is usually treated as a field formality. It's actually the first record of almost every number accounting cares about: labor, equipment, deliveries, delays and changes. Here's what to capture, and how it flows to cost, billing and claims.
Close readiness and the weekly cash forecast
A practical handoff from cutoff evidence and job cost-to-complete to a cash forecast owners can review each week.
A second set of eyes on construction accounting
A practical approval handoff for contractor owners and controllers, from invoice review through payment and close.
Project Financials and company Accounting: where the records meet
Understand the difference between a project budget or commitment and the company books, and the handoffs that still need review.
A practical project-to-accounting reconciliation
A repeatable review of budget, commitments, posted costs and billing without assuming that project records automatically post to the ledger.
Retainage: a controller's monthly follow-up
Track retainage receivable and payable separately, reconcile changes, and make release dates visible in the cash plan.
Cost-to-cost percent complete: when it lies and how to catch it
Cost-to-cost is the most common way contractors measure progress, and it's only as honest as the cost to complete behind it. Five ways it misleads, a worked example of each, and the cross-checks that catch them early.
The 3-way match, explained for construction AP
The textbook 3-way match is a purchase order, a receiving report and an invoice. Construction AP needs a version that works for subcontracts, progress billing, retainage and lien waivers. Here's what to match, and where it breaks.
Over billing vs under billing: what your WIP is telling you
Over and under billing aren't good or bad on their own. They're symptoms. Here's how to read each one, the questions that separate a billing problem from an estimate problem, and the checks a surety will run before you do.
Retainage, lien waivers and pay apps on one record
A pay app, the retainage it withholds and the lien waivers that release it are one transaction. Most contractors track them in three places. Here's how each piece works and why they belong together.
Agents with approvals: our approach to AI in the back office
AI in construction accounting goes wrong in two ways: chatbots that know nothing about your jobs, and autopilots that post entries nobody checked. Our model is an apprentice with a supervisor. Here are the rules.
WIP shouldn't be a month-end project
The work-in-progress schedule is the most important report a contractor produces, and most build it from four sources a week after the month closes. Here's the math, what over and under billing really tell you, and why WIP should be live.