Articles tagged Contracts
How to track subcontractor certificates of insurance: collect, review, renew, hold
Collecting a COI once at award isn't tracking. Here is a routine for subcontractor insurance: set the requirements in the subcontract, review certificates and endorsements against them, log every policy's dates, chase renewals before they lapse, and connect it all to payment, with a worked renewal calendar.
AIA A201 vs ConsensusDocs 200: how the two standard contract families differ
AIA A201 is the architect-centered general conditions document used with a separate owner-contractor agreement. ConsensusDocs 200 combines the agreement and general conditions in one form drafted by a coalition of industry groups. Here is how they differ on structure, the architect's role, changes and disputes, plus what to check whichever one you sign.
Builder's risk vs general liability: which policy pays when something goes wrong on site
Builder's risk is property insurance on the project itself while it's being built. General liability covers the contractor's legal liability to other people for injury and damage. Here is how the two differ, who usually buys each, how one fire can involve both, and the gaps contractors find too late.
How to calculate general conditions costs: build them from the schedule, not a percentage
General conditions are mostly the cost of time on site: staff, the field office, temporary facilities and cleanup. Estimate them from the schedule by pricing staff and site costs per month, adding one-time and quantity-driven items, and checking the contract for what belongs in the fee. Here is each step and a worked 12-month example.
How to calculate liquidated damages exposure and carry it in your forecast
Liquidated damages exposure is the days between your forecast finish and the adjusted contract date, times the daily rate, for each milestone that carries LDs, limited by any cap. The hard part is using honest inputs: approved extensions only, a forecast from the current schedule, pending requests and risk shown as separate scenarios. Here is the method and a worked example with two milestones.
How to handle a differing site condition: the first 48 hours
When the excavator hits rock the borings didn't show, or demolition opens a wall full of rot, what the field does in the next day or two decides whether the cost is recoverable. Here is how to make it safe, stop disturbing it, give written notice, document it, get direction, track cost and time separately, and a worked example.
How to read the payment terms in a construction contract: a clause-by-clause checklist
Payment terms decide when your work turns into cash, and they're spread across the agreement, the general conditions and the supplementary conditions. Find the billing cycle, the review period, the due date, retainage, the conditions to payment, the grounds to withhold and what happens when payment is late. Here is a checklist and a worked timeline.
Pay-when-paid vs pay-if-paid: who carries the risk when the owner doesn't pay
Pay-when-paid sets when a subcontractor gets paid; pay-if-paid tries to decide whether it gets paid at all. Here is how the two clauses differ, what the wording looks like, how courts tend to read them, a worked example and the mistakes both GCs and subs make.
Substantial completion vs final completion: what each one triggers
Substantial completion is when the owner can use the building; final completion is when every last item, document and payment obligation is done. Here is what each milestone triggers, how they differ, a worked retainage example and the mistakes that keep jobs open for months.
AIA G710 vs G714 vs G701: which form for which change
G710 is the architect's no-cost instruction. G714 directs changed work before the price is agreed. G701 records an agreed change in sum and time. Here is who signs each, what each one does to the contract, and the mistakes that turn a G710 into free work.
Snagging, variations, retention: a US-UK construction term map
A snagging list is a punch list, a variation order is a change order and retention is retainage. A full US-UK crosswalk of construction terms, with the contract differences that matter: JCT and NEC vs AIA, practical vs substantial completion, and Canadian holdback.
Performance bond vs payment bond: who each one protects
A performance bond protects the owner if the contractor doesn't finish the work; a payment bond protects subcontractors, laborers and suppliers if the contractor doesn't pay them. Here is how they differ, how a claim works under each, a worked example and the mistakes contractors make with both.
General contractor vs construction manager: roles, risk and how each gets paid
A general contractor holds the construction contract and the trade subcontracts, usually after design is done. A construction manager joins during design, either as the owner's adviser or at risk under a guaranteed maximum price. Here is how the roles differ, when each fits, a worked example and the mistakes owners and builders make.