Articles tagged Bidding
How to build a construction estimate from scratch: from takeoff to bid price
A construction estimate is built in layers: quantities from the drawings, direct cost for labor, material, equipment and subcontracts, general conditions from the schedule, then contingency, overhead and profit, insurance and bond. Here is each layer in order, with a full worked example for a 6,000 square foot tenant improvement.
How to level subcontractor bids: building a bid tab that compares the same scope
The low bid is often low because it left something out. Leveling puts every bidder on the same scope before you compare price: break the package into scope lines, tab each bid line by line, price every exclusion with a plug, then rank the leveled totals and check the non-price items. Here is each step and a worked three-bidder example.
Will you lose your bid bond if you withdraw your bid?
Usually not before bid opening, and usually yes after it, unless you made a provable clerical mistake and act fast. Here is how withdrawal, the mistake-in-bid doctrine, FAR 14.407 and state statutes decide it.