Articles tagged Billing
Cash flow on a construction job: why profitable jobs run out of money
A job can earn a healthy margin and still drain your bank account for months. Profit is an accounting result; cash is timing. Here's how the pay app cycle, retainage and payment terms open a cash gap on every job, and how to see it coming.
How to bill stored materials on a pay application, and move them to installed
Stored materials let you bill for equipment and material that is bought and delivered but not yet installed. Check the contract first, get off-site storage approved in advance, send the backup with the bill, put the amount in the stored materials column, and move it to work completed when it goes in so it is never billed twice. Here is each step with a two-month worked example.
How to build a construction cash flow projection: from the cost curve to the month you're lowest
A job's cash flow projection moves every dollar of billing and cost to the month it's actually paid. Spread cost by month, bill it, delay the receipts by the owner's payment terms and retainage, time each kind of cost by its own terms, then run the cumulative total to find the peak cash need. Here is each step and a worked eight-month example.
How to calculate retainage, and how to get it released
Retainage is a percentage of each progress payment held back until the job is done. The math is simple until a reduction kicks in, stored materials carry a different rate, or the owner releases it less a punch list holdback. Here is the formula, a six-month worked example, the release billing, and how it flows down to subcontractors.
How to fill out a G702/G703 pay application, line by line
A G702/G703-style pay application is two pages that have to agree: a continuation sheet that bills each schedule of values line, and a summary that turns those totals into the payment due. Here is how to fill in every column and line, a worked example that ties, and the checks that stop it coming back.
How to price a change order: labor, material, subs and markup, worked line by line
Owners review change order proposals line by line, so price them that way: define the scope, read the changes clause, cost labor at burdened rates, add material, equipment and sub quotes, then apply the contract's markups in order. Here is each step and a full worked example from direct cost to the final number.
How to read the payment terms in a construction contract: a clause-by-clause checklist
Payment terms decide when your work turns into cash, and they're spread across the agreement, the general conditions and the supplementary conditions. Find the billing cycle, the review period, the due date, retainage, the conditions to payment, the grounds to withhold and what happens when payment is late. Here is a checklist and a worked timeline.
Schedule of values vs budget: billing lines and cost codes are not the same thing
The schedule of values splits the contract price into lines the owner pays against. The budget splits expected cost into cost codes the contractor manages against. Here is how they differ, why they shouldn't be the same list, how to map one to the other, a worked example and the mistakes that hide over-billing.
Holdback vs retainage: Canadian prompt payment for US contractors
Holdback is Canada's statutory cousin of retainage. In Ontario every payer holds back 10 percent by law, invoices run on a 28-day clock, and since January 2026 holdback comes out every year. What US contractors need to change before billing their first Ontario job.
Notice of non-payment vs stop payment notice vs mechanics lien
A notice of non-payment warns people, a stop payment notice freezes the money and a mechanics lien attaches to the property. What each one does, who sends it, the deadlines in California, Florida and Texas, and what a GC should do when one lands.
Retainage: a controller's monthly follow-up
Track retainage receivable and payable separately, reconcile changes, and make release dates visible in the cash plan.
Over billing vs under billing: what your WIP is telling you
Over and under billing aren't good or bad on their own. They're symptoms. Here's how to read each one, the questions that separate a billing problem from an estimate problem, and the checks a surety will run before you do.
Retainage, lien waivers and pay apps on one record
A pay app, the retainage it withholds and the lien waivers that release it are one transaction. Most contractors track them in three places. Here's how each piece works and why they belong together.