Articles tagged Field

Field

How to track construction permits, conditions and inspections so nothing lapses

A permit number on a spreadsheet isn't permit tracking. Here is how to keep a permit register, turn every permit condition into an owned task with a date, tie inspections to the schedule, watch the expiration rules that actually apply, and close permits out cleanly, with a worked register.

5 min read

Schedule

How to build a three-week look-ahead schedule the field will actually use

The master schedule says what has to happen. The three-week look-ahead says who does it, where, and what has to be cleared first. Here is how to pull it from the master, break it down to crew level, screen every activity for constraints, get commitments from the trades, and roll it forward each week, with a worked example.

6 min read

Field

How to document weather delays so a time extension holds up

Rain, wind, cold and heat stop work on every job, but a weather day only becomes extra time if you can show the weather was unusual, that it stopped critical work, and that you gave notice. Here is what to record each day, how to tally lost days against the contract's allowance, and a worked example for one month.

6 min read

Field

How to handle a differing site condition: the first 48 hours

When the excavator hits rock the borings didn't show, or demolition opens a wall full of rot, what the field does in the next day or two decides whether the cost is recoverable. Here is how to make it safe, stop disturbing it, give written notice, document it, get direction, track cost and time separately, and a worked example.

7 min read

Scheduling

How to run a pull planning session: from milestone back to Monday

Pull planning has the trades plan a phase backwards from a milestone, one handoff at a time, so the sequence comes from the people doing the work. Here is how to prepare, who to invite, how to run the wall, how to turn it into a look-ahead, and a worked example for a floor of interior build-out.

6 min read

Field

How to run a punch walk that closes the list instead of growing it

A punch walk is where the owner, architect and contractor agree what is left before the building is accepted. Here is how to prepare for it, who should walk, how to write items a trade can fix without a phone call, how to close them, and a worked example from one floor.

6 min read

Field

How to run a toolbox talk crews actually listen to

A toolbox talk is a short safety meeting at the start of a shift. Here is how to pick a topic tied to this week's work, run it as a conversation in ten to fifteen minutes, record who attended, follow up on what crews raise, and a complete example talk for a delivery day.

5 min read

Project controls

How to track labor productivity: units installed against hours spent

Hours spent only tell you how much labor budget is gone. To know whether the crew is keeping up, compare the hours with the quantity installed: earned hours from the budget unit rate, a productivity index, and a forecast of hours to finish. Here is the method by cost code, with a six-week conduit example and three ways to forecast the rest.

6 min read

Field

How to write a daily construction report that holds up later

A daily report takes fifteen minutes to write and is the record everyone reaches for when a delay, change or dispute comes up months later. Here is what to capture, section by section, how to write a delay entry that is actually useful, and a complete sample report for a rain day.

5 min read

RFIs

How to write an RFI that gets answered the first time

Most slow RFI answers start with a vague question. Here is how to decide whether you need an RFI at all, how to write the subject, the question and the proposed fix, how to set a needed-by date the designer will respect, and what to do when the answer comes back. With a before-and-after example.

6 min read

Project management

Submittal vs RFI: which one to send, and why it matters

A submittal shows the design team what you plan to furnish and install; an RFI asks them what the documents mean. Here is how the two differ, when to use each, how they connect, a worked example and the mistakes that cost time and money.

5 min read

Field

Field to ledger: why daily logs are financial documents

The daily log is usually treated as a field formality. It's actually the first record of almost every number accounting cares about: labor, equipment, deliveries, delays and changes. Here's what to capture, and how it flows to cost, billing and claims.

5 min read

Daily logs

How to write and verify a useful daily field note

Record a specific observation in the os.construction Daily Log, save it, and return to the day to check the saved entry.

5 min read

Change orders

The real cost of re-keying a change order

We followed one change order from a ceiling cavity to the pay app and counted every time someone retyped the same facts. The typing is the cheap part.

6 min read