Articles tagged Closeout
How to track construction permits, conditions and inspections so nothing lapses
A permit number on a spreadsheet isn't permit tracking. Here is how to keep a permit register, turn every permit condition into an owned task with a date, tie inspections to the schedule, watch the expiration rules that actually apply, and close permits out cleanly, with a worked register.
How to run a punch walk that closes the list instead of growing it
A punch walk is where the owner, architect and contractor agree what is left before the building is accepted. Here is how to prepare for it, who should walk, how to write items a trade can fix without a phone call, how to close them, and a worked example from one floor.
Substantial completion vs final completion: what each one triggers
Substantial completion is when the owner can use the building; final completion is when every last item, document and payment obligation is done. Here is what each milestone triggers, how they differ, a worked retainage example and the mistakes that keep jobs open for months.
Commissioning (Cx) for general contractors: who does what, when
Commissioning checks that building systems are installed, tested and able to run the way the owner needs. What ASHRAE Standard 202, Guideline 0 and LEED's commissioning prerequisite expect, and what the GC, the trades, the CxA and the design team each own from design to the warranty year.
TCO vs certificate of occupancy: what you need before turnover
A TCO lets an owner occupy safe parts of a building before everything is finished; a certificate of occupancy is the final, permanent approval. What the IBC says, how NYC and Philadelphia handle TCO permits, and what a GC needs in hand before turnover.