Articles tagged Schedule forensics
Acceleration and disruption: track time recovery and production separately
Distinguish earlier completion efforts from productivity effects and organize the records needed to evaluate changed working methods.
Activity durations and logic: build a schedule the field can update
Choose useful activity detail, support durations with production assumptions and test whether dependency logic represents real construction handoffs.
AI in schedule analysis: separate helpful drafting from verified calculation
Distinguish schedule calculation, risk simulation, prediction and AI drafting, then use an evidence-based review process for generated findings.
A construction schedule audit you can actually act on
Review schedule logic, contract requirements and field evidence separately, then turn findings into specific actions with owners and due dates.
Build a baseline schedule submission the reviewer can follow
Prepare the schedule file, narrative, assumptions and transmittal as one traceable baseline package, using the actual project requirements.
Schedule calendars: why five working days can mean different finish dates
Learn how shifts, weekends, holidays and calendar changes affect a construction forecast, with a worked example and practical review checks.
Concurrent delay: establish the facts before labeling the overlap
Distinguish overlapping events from effects on completion, document independent paths and prepare the evidence needed for concurrent-delay review.
Schedule constraints: explain the date before changing the logic
Review imposed dates, understand negative float and document constraints without confusing a calculation result with responsibility for delay.
Choose a delay-analysis method by the question and the records
Compare prospective impact models, period reviews and as-built comparisons by their evidence needs, assumptions and the questions they can answer.
Extension-of-time preparation: build the evidence trail as the event develops
Organize event records, notices, schedule versions and mitigation evidence for a project-specific extension-of-time review.
GAO and DCMA schedule reviews: use metrics to investigate the plan
Understand the role of schedule-quality metrics, check their populations and thresholds, and connect results to a broader reliability review.
Lags and leads: make hidden waiting time visible
Review relationship lags, negative lag and waiting periods with clear units, calendars and ownership before relying on the construction forecast.
Write a monthly schedule narrative that explains what changed
Turn a schedule update into a clear account of progress, forecast movement, logic changes, risks and decisions with a practical narrative structure.
P6 scheduling settings: the assumptions behind the finish date
Review retained logic, progress override, criticality and lag calendars before comparing Primavera P6 schedules or explaining forecast changes.
How to read a schedule analysis report before trusting the findings
Check source identity, method, assumptions, limitations and evidence before treating a schedule-analysis finding as a project decision.
A recovery schedule needs a construction plan behind every earlier date
Evaluate recovery options with crew, access and procurement evidence, then compare forecast benefit, constraints and implementation commitments.
Build a schedule standards crosswalk without inventing one universal rule
Map schedule requirements to the correct document, edition and clause while separating contract obligations, guidance and software definitions.
Time impact analysis: build a model another reviewer can follow
Prepare a traceable time impact analysis with a documented base schedule, event fragnet, controlled calculation and clear limits on the conclusion.
Total float and free float: explain the difference at the coordination meeting
Use a simple construction network to distinguish total float from free float and understand why an activity can affect a trade before completion.
Received a P6 XER file? Preserve the source before reviewing the schedule
Create a reliable intake record for Primavera P6 XER files, check imports and distinguish original schedule data from recalculated results.