Articles tagged WIP

Accounting

How to close the month in construction accounting: a step list from cutoff to lock

A construction month-end close gets every cost and every billing into the right month, proves cash and the subledgers against the ledger, updates the WIP schedule from current cost-to-complete, has someone else review it, and then locks the period. Here is the step list, an example close calendar and a worked example of what one late invoice does to WIP.

7 min read

Accounting

How to prepare a WIP schedule, step by step

A work-in-progress schedule turns four numbers per job into earned revenue, gross profit and over or under billing. Here's the month-end procedure in order, from cost cutoff to the journal entry, with a three-job percentage-of-completion example that ties out and the review questions that catch a bad forecast.

7 min read

Job cost

How to run a cost-to-complete review: forecast what's left, line by line, before the job fades

A cost-to-complete review is where a job's margin is actually forecast. Cut off cost, refresh commitments, forecast each cost code from what is physically left, compare the estimate at completion with budget, and roll it up into projected margin. Here is each step, a weekly labor check, and a worked four-code example.

6 min read

Accounting

Percentage of completion vs completed contract method: how contractors recognize revenue

The percentage of completion method recognizes contract revenue as the work progresses; the completed contract method waits until the job is done. Here is how each one works, where each is allowed for books and for tax, a worked example on one job and the mistakes that distort a contractor's results.

5 min read

WIP

What sureties look for in your WIP

Your surety reads the WIP schedule to answer one question: will this contractor finish its work and pay its bills? Here's what an underwriter checks, the patterns that cost you bonding capacity, and how to hand over a WIP that answers the questions before they're asked.

5 min read

Accounting

Cost-to-cost percent complete: when it lies and how to catch it

Cost-to-cost is the most common way contractors measure progress, and it's only as honest as the cost to complete behind it. Five ways it misleads, a worked example of each, and the cross-checks that catch them early.

5 min read

Accounting

Over billing vs under billing: what your WIP is telling you

Over and under billing aren't good or bad on their own. They're symptoms. Here's how to read each one, the questions that separate a billing problem from an estimate problem, and the checks a surety will run before you do.

6 min read

Accounting

WIP shouldn't be a month-end project

The work-in-progress schedule is the most important report a contractor produces, and most build it from four sources a week after the month closes. Here's the math, what over and under billing really tell you, and why WIP should be live.

5 min read