Articles tagged Change orders
AIA A201 vs ConsensusDocs 200: how the two standard contract families differ
AIA A201 is the architect-centered general conditions document used with a separate owner-contractor agreement. ConsensusDocs 200 combines the agreement and general conditions in one form drafted by a coalition of industry groups. Here is how they differ on structure, the architect's role, changes and disputes, plus what to check whichever one you sign.
How to handle a differing site condition: the first 48 hours
When the excavator hits rock the borings didn't show, or demolition opens a wall full of rot, what the field does in the next day or two decides whether the cost is recoverable. Here is how to make it safe, stop disturbing it, give written notice, document it, get direction, track cost and time separately, and a worked example.
How to price a change order: labor, material, subs and markup, worked line by line
Owners review change order proposals line by line, so price them that way: define the scope, read the changes clause, cost labor at burdened rates, add material, equipment and sub quotes, then apply the contract's markups in order. Here is each step and a full worked example from direct cost to the final number.
AIA G710 vs G714 vs G701: which form for which change
G710 is the architect's no-cost instruction. G714 directs changed work before the price is agreed. G701 records an agreed change in sum and time. Here is who signs each, what each one does to the contract, and the mistakes that turn a G710 into free work.
Back charges: how to issue, dispute and document them
A back charge is a deduction a contractor takes from a subcontractor or supplier for cost they caused. It sticks when the subcontract allows it, notice and a chance to cure came first, and the cost is documented. Here is how to issue one, how to dispute one, and the paper trail both sides need.
Markup vs margin: the pricing mistake hiding in your change orders
Add 20% to cost and you don't make 20%. You make 16.7%. The gap between markup and margin is small on one change order and expensive across a year of them. Here's the math, where it bites, and how to price changes so the number you quote is the number you keep.
Field to ledger: why daily logs are financial documents
The daily log is usually treated as a field formality. It's actually the first record of almost every number accounting cares about: labor, equipment, deliveries, delays and changes. Here's what to capture, and how it flows to cost, billing and claims.
Change events vs change orders: tracking exposure before it's signed
By the time a change order is signed, the money is already spent or already lost. The change event is where exposure starts. Here's how to track it, what to put in the forecast, and why the gap between the two is where margin leaks.
The real cost of re-keying a change order
We followed one change order from a ceiling cavity to the pay app and counted every time someone retyped the same facts. The typing is the cheap part.