Articles tagged Subcontracts
How to track subcontractor certificates of insurance: collect, review, renew, hold
Collecting a COI once at award isn't tracking. Here is a routine for subcontractor insurance: set the requirements in the subcontract, review certificates and endorsements against them, log every policy's dates, chase renewals before they lapse, and connect it all to payment, with a worked renewal calendar.
Builder's risk vs general liability: which policy pays when something goes wrong on site
Builder's risk is property insurance on the project itself while it's being built. General liability covers the contractor's legal liability to other people for injury and damage. Here is how the two differ, who usually buys each, how one fire can involve both, and the gaps contractors find too late.
How to level subcontractor bids: building a bid tab that compares the same scope
The low bid is often low because it left something out. Leveling puts every bidder on the same scope before you compare price: break the package into scope lines, tab each bid line by line, price every exclusion with a plug, then rank the leveled totals and check the non-price items. Here is each step and a worked three-bidder example.
How to prequalify subcontractors: a questionnaire, a financial review and a dollar limit
Prequalification decides who is allowed to bid before price enters the picture. Set your criteria first, send one questionnaire, verify what comes back, read the financials, set single-project and aggregate limits, and re-check before every award. Here is each step and a worked example of setting a sub's limits.
How to review a subcontractor pay application before you approve it
A general contractor's review of a subcontractor pay application checks the contract and change orders, verifies progress with the field, tests stored materials and retainage, confirms insurance, lien waivers and other compliance, and checks the math, before approving an amount AP can pay. Here is each step with a worked review that cuts a $384,000 request to $307,000.
How to run a construction buyout: buy-by dates, a buyout log and where the savings go
Buyout turns the estimate into signed subcontracts and purchase orders. Run it as a schedule, not a to-do list: work back from each package's need-on-site date to a buy-by date, bid and level, write the scope into the contract, record every variance against the budget, and track the log weekly. Here is each step with a worked buyout log.
How to write a scope of work for subcontractors that leaves no gaps between trades
A subcontract scope of work decides who pays when something turns out to be missing. Write it from the leveled bid, name the documents it's based on, spell out the items trades argue about, and check every interface item against the neighboring trades with a responsibility matrix. Here is the method, a scope outline and a worked example that finds two gaps and an overlap.
Pay-when-paid vs pay-if-paid: who carries the risk when the owner doesn't pay
Pay-when-paid sets when a subcontractor gets paid; pay-if-paid tries to decide whether it gets paid at all. Here is how the two clauses differ, what the wording looks like, how courts tend to read them, a worked example and the mistakes both GCs and subs make.
Back charges: how to issue, dispute and document them
A back charge is a deduction a contractor takes from a subcontractor or supplier for cost they caused. It sticks when the subcontract allows it, notice and a chance to cure came first, and the cost is documented. Here is how to issue one, how to dispute one, and the paper trail both sides need.
Performance bond vs payment bond: who each one protects
A performance bond protects the owner if the contractor doesn't finish the work; a payment bond protects subcontractors, laborers and suppliers if the contractor doesn't pay them. Here is how they differ, how a claim works under each, a worked example and the mistakes contractors make with both.