Articles tagged Estimating
Direct vs indirect costs in construction: job cost, general conditions and overhead
Direct costs can be traced to a specific job or piece of work. Indirect costs support the work without belonging to one item: the job's general conditions and the company's overhead. Here is how to draw the line, how each gets recovered, a worked estimate and the coding mistakes that distort margins.
Hard costs vs soft costs in construction: what goes where, and why it matters
Hard costs pay for the physical work of building. Soft costs pay for everything that makes the building possible but isn't built: design, permits, financing, legal and insurance. Here is how to tell them apart, the gray areas, a worked owner budget and the mistakes that leave a project short of money.
How to build a construction estimate from scratch: from takeoff to bid price
A construction estimate is built in layers: quantities from the drawings, direct cost for labor, material, equipment and subcontracts, general conditions from the schedule, then contingency, overhead and profit, insurance and bond. Here is each layer in order, with a full worked example for a 6,000 square foot tenant improvement.
How to calculate general conditions costs: build them from the schedule, not a percentage
General conditions are mostly the cost of time on site: staff, the field office, temporary facilities and cleanup. Estimate them from the schedule by pricing staff and site costs per month, adding one-time and quantity-driven items, and checking the contract for what belongs in the fee. Here is each step and a worked 12-month example.
How to calculate construction overhead and markup for a bid
Your markup has one job: recover company overhead and leave the profit you planned. To set it, you need an annual overhead budget, a realistic revenue volume, a profit target, and the margin-to-markup conversion most estimators get wrong. Here's the method step by step, with a worked bid and what happens to the number when volume drops.
How to level subcontractor bids: building a bid tab that compares the same scope
The low bid is often low because it left something out. Leveling puts every bidder on the same scope before you compare price: break the package into scope lines, tab each bid line by line, price every exclusion with a plug, then rank the leveled totals and check the non-price items. Here is each step and a worked three-bidder example.
How to price a change order: labor, material, subs and markup, worked line by line
Owners review change order proposals line by line, so price them that way: define the scope, read the changes clause, cost labor at burdened rates, add material, equipment and sub quotes, then apply the contract's markups in order. Here is each step and a full worked example from direct cost to the final number.
Construction job costing: how to set up cost codes
A cost code list decides what your job cost report can tell you. Too coarse and overruns hide; too fine and the field codes everything to the first line on the list. Here's how to structure codes and cost types, when to follow CSI MasterFormat and when to build your own, a worked tenant improvement budget, and the rules that keep coding clean.
Labor burden: the number behind every bid
A carpenter who earns $36 an hour costs you a lot more than $36 an hour. Labor burden is the gap, and if your estimate, your job cost and your T&M rates each use a different version of it, you're losing money in at least one of them. Here's how to build the number.
Markup vs margin: the pricing mistake hiding in your change orders
Add 20% to cost and you don't make 20%. You make 16.7%. The gap between markup and margin is small on one change order and expensive across a year of them. Here's the math, where it bites, and how to price changes so the number you quote is the number you keep.