How to set up a construction project budget: from the awarded estimate to a locked original
A project budget is the awarded estimate restated as cost lines you will actually track. Reconcile the estimate to the signed contract, take out the fee, load each cost code and cost type, give general conditions and contingency their own lines, lock the original, and from then on change it only through recorded budget changes and transfers. Here is each step with a worked $4.85 million example.