Close readiness and the weekly cash forecast

A practical handoff from cutoff evidence and job cost-to-complete to a cash forecast owners can review each week.

Charley Forey2 min readAccountingCash flowJob cost
On this page
  1. Prepare the close
  2. Turn the estimates into a weekly cash view

A controller needs two views at once: what belongs in the books through the cutoff, and when money is expected to move. A job cost forecast estimates remaining cost and expected completion margin; cutoff review determines what belongs in the books. A cash forecast adds payment and collection timing. Neither replaces a reconciliation.

Prepare the close

  1. Choose the cutoff and scope. Identify the period, entities and jobs included. Gather bank statements, ledger balances, open payables and receivables, retainage schedules and job-cost support for that date.
  2. Resolve or assign exceptions. Compare each available subledger to its control account and investigate differences without offsetting unrelated entities or balances. Mark missing evidence or an unavailable check for follow-up; it is not a pass.
  3. Ask the PM for remaining cost. Review the budget, approved commitments and posted costs with the person closest to the work. Record the cost-to-complete, date and reason for material changes. Estimated cost at completion combines actual cost and remaining cost; it is an estimate, not cash due in the period.
  4. Review and sign off independently. A second person checks the evidence and open items. If the underlying postings or assumptions change, update the affected review before closing.

The Accounting module is live. Dated PM cost-to-complete inputs, AR reconciliation, approved WIP posting and close checks are implemented. Review historical source coverage, calculation exceptions and the evidence for your company before relying on a close result. Follow the forecast-to-close workflow; a missing or failed check is not a passing reconciliation.

Turn the estimates into a weekly cash view

Start with a verified opening cash balance. For each of the next 13 weeks, list expected owner receipts, retainage releases, payroll, subcontract and supplier payments, overhead and other known cash movements. Use the expected payment date, not the date a cost was incurred or an invoice was issued. Sum each week’s inflows and outflows and carry the ending balance forward as the next opening balance.

For example, $100,000 opening cash plus $30,000 expected receipts less $80,000 expected payments leaves $50,000 at week end. If the receipt moves to the following week, the first week’s projection falls to $20,000. Confirm whether that balance covers the commitments coming due; update the owner when the answer changes.

Each week, compare the prior forecast with actual receipts and payments, move late items to realistic dates, and record why significant assumptions changed. Keep retainage separate from current collections and avoid counting an expected release twice. The cash flow calculator illustrates a single job; company overhead and timing still need attention.

Share this article

Written by

Charley Forey

Founder of os.construction. We're building the operating system for construction. Project Financials follows job money, and company Accounting covers the books and controls. AI agents remain planned. We write about how money and data actually move on a job, and we build in public.

Apply to the founding program →Start a free trial →
Keep readingAll articles →
Job cost

Direct vs indirect costs in construction: job cost, general conditions and overhead

Direct costs can be traced to a specific job or piece of work. Indirect costs support the work without belonging to one item: the job's general conditions and the company's overhead. Here is how to draw the line, how each gets recovered, a worked estimate and the coding mistakes that distort margins.

5 min read

Cash flow

How to build a 13-week cash flow forecast for a construction company

A 13-week cash forecast lists every receipt and payment the company expects, week by week, starting from the cash actually in the bank. Date receipts by when each owner really pays, date payments by payroll, terms and pay-when-paid, set a minimum balance, and roll it forward every week against what happened. Here is each step and a worked 13-week example with a low week.

7 min read

Estimating

How to calculate construction overhead and markup for a bid

Your markup has one job: recover company overhead and leave the profit you planned. To set it, you need an annual overhead budget, a realistic revenue volume, a profit target, and the margin-to-markup conversion most estimators get wrong. Here's the method step by step, with a worked bid and what happens to the number when volume drops.

5 min read

Open file