Solutions by delivery method · CM at risk

CM at risk software for an open book under a cap.

As a CM at risk you bill the owner your cost plus a fee, up to a guaranteed maximum price, and the owner can audit every dollar. os.construction keeps buyout, subcontracts, sub billing, contingency moves and the owner bill on one data core, so the backup is the record itself.

14-day free trial. Pricing for paid plans isn't set yet.

01 · How the money moves

How money moves under a GMP.

The cost of the work flows up from subcontracts and sub pay apps. The owner side bills that cost plus fee, checks it against the cap, and settles the savings at the end.

Money flow on a CM at risk project with a guaranteed maximum priceThe preconstruction estimate becomes the budget by cost code and sets the GMP amendment: cost of the work, general conditions, contingency and fee. Bid packages are leveled and bought out into subcontracts with schedules of values and retainage. Buyout savings and contingency moves are recorded as budget transfers. Subcontractors bill monthly on their commitments; their invoices pass lien waiver and insurance holds in payables and post to job cost. The owner is billed the cost of the work plus fee, checked against the GMP cap. Owner change orders revise the GMP, and at the end the GMP settlement shares savings as the contract says.COST OF THE WORKOWNER SIDESets the GMPAwardedBuyout savingsApprovedCost of the workRevised GMPCap checkedPRECONEstimate to budgetBy cost codeBUYOUTBid packagesLeveled and awardedCOMMITMENTSSubcontractsSOV + retainageMONTHLYSub pay appsWaiver + COI holdsACTUALSJob costPosted, with backupCONTRACTGMP amendmentCost + GCs + feeRISK POOLContingencyEvery move on recordOWNERChange ordersRevise the GMPMONTHLYOwner billingCost + fee, to the capFINALGMP settlementShared savingsMoney flow on a CM at risk project with a guaranteed maximum priceThe preconstruction estimate becomes the budget by cost code and sets the GMP amendment: cost of the work, general conditions, contingency and fee. Bid packages are leveled and bought out into subcontracts with schedules of values and retainage. Buyout savings and contingency moves are recorded as budget transfers. Subcontractors bill monthly on their commitments; their invoices pass lien waiver and insurance holds in payables and post to job cost. The owner is billed the cost of the work plus fee, checked against the GMP cap. Owner change orders revise the GMP, and at the end the GMP settlement shares savings as the contract says.COST OF THE WORKOWNER SIDESets the GMPAwardedBuyout savingsApprovedCost of the workRevised GMPPRECONEstimate to budgetBy cost codeBUYOUTBid packagesLeveled and awardedCOMMITMENTSSubcontractsSOV + retainageMONTHLYSub pay appsWaiver + COI holdsACTUALSJob costPosted, with backupCONTRACTGMP amendmentCost + GCs + feeRISK POOLContingencyEvery move on recordOWNERChange ordersRevise the GMPMONTHLYOwner billingCost + fee, to the capFINALGMP settlementShared savings
Illustrative GMP flow. What counts as cost of the work, how contingency may be used and how savings split are set by your owner agreement (for example AIA A133 or ConsensusDocs 500).

CM at risk billing and cost, line by line

WhatHow it usually worksIn os.construction
The GMP stackCost of the work, general conditions, contingency and fee, under a ceiling. Names and rules vary by agreement.The budget holds cost codes for each bucket. The prime contract’s GMP billing method prices fee and the cap from what AR has already billed, through the Accounting API.
BuyoutTrade packages are bought out against the GMP budget; savings usually go to contingency or back to the owner, per the contract.Bidding levels bids, records an approved award and creates the subcontract from awarded lines. A buyout plan allocates the award against a captured budget snapshot.
ContingencyThe CM’s contingency is drawn by moving money into cost lines, and owners audit every move.Budget Modifications record each transfer with from line, to line, amount and a note, and list every transfer on one tab.
Sub billing and complianceDozens of sub pay apps a month, each with retainage, insurance and lien waivers before payment.Sub invoices bill on the commitment SOV with retainage. Accounts Payable holds payment for a missing lien waiver or expired certificate of insurance, and pays with joint checks when needed.
Shared savings and auditAt the end, unspent GMP is returned or split. The owner’s auditor wants each cost traced to its source.One GMP settlement per contract, with shared savings priced by AR. Every job cost line links to the GL line and source record behind it.

General information about common contract terms, not legal advice. Retainage, stored materials, lien and prevailing wage rules vary by contract and by state.

02 · Where it breaks today

Where a GMP gets hard to defend.

  1. Failure 01

    Contingency moves no one can explain

    Contingency was drawn down in a spreadsheet over eighteen months. At the owner’s audit, nobody can show which transfer paid for what, or when.

  2. Failure 02

    Buyout that never reached the budget

    Trades were leveled and awarded in spreadsheets. Savings were promised to the owner, but the budget still shows the estimate and the commitments were retyped.

  3. Failure 03

    The owner bill built by hand

    Every month someone pulls sub pay apps, payroll and invoices, applies fee and insurance, checks the cap and assembles the backup binder. One missed lien waiver and the draw stalls.

03 · How one record avoids them

Five workflows, one record.

Each step is a shipped workflow with a docs page or explainer. The GMP budget, buyout, subcontracts, payables and owner billing share one project and one set of cost codes.

  1. 01

    Level, award and buy out

    Release packages, level bids line by line with the lowest per line highlighted, record an award that a different admin approves, create the subcontract from the awarded lines, and allocate the award against a captured budget snapshot.

    Answers failure 02Explainer: bidding to an awarded commitment →
  2. 02

    Record every contingency move

    Move contingency into cost lines with a budget Modification: from line, to line, amount and note. The Modifications tab lists every transfer for the audit.

    Answers failure 01Docs: budget →
  3. 03

    Take sub billing on the commitment

    Sub invoices fill from the commitment’s SOV with This Period, Materials Stored and retainage per line, and move through review statuses to approval.

    Answers failure 03Docs: commitments →
  4. 04

    Hold payment for waivers and insurance

    Accounts Payable holds a bill for a missing lien waiver, an expired certificate of insurance or a missing W-9, supports joint checks, and is pay-when-paid aware in the payment run.

    Answers failure 03Docs: Accounts Payable →
  5. 05

    Bill cost plus fee to the cap

    Set the prime contract to GMP billing. Through the Accounting API, send the period’s costs and Accounts Receivable prices fee and the GMP cap from what was already billed into a draft invoice for approval.

    Answers failure 03Docs: billing methods →
04 · In the product

The budget, the change and the bill, in the app.

Real screens on sample data: the budget forecast by cost code, a change event with its chain, and the G702 summary of an owner pay app.

The Cost codes tab of the Budget and cost analytics pack with bars for estimated cost at completion and committed costs by cost code against revised budget ticks.
Committed and estimated cost at completion against each revised budget line. Recorded in the app · sample data
A change event record showing a chain strip of change event, RFQs, PCOs, change orders and budget change, with a cost line item by cost code and a rough order of magnitude.
A change event with its chain from event to the budget change. Recorded in the app · sample data
The G702 Application and Certificate panel for Pay App #9: original contract sum, net change by change orders, contract sum to date, completed and stored, retainage on work and materials, total earned less retainage, previous certificates, current payment due and balance to finish.
The G702 summary: change orders, retainage and payment due computed from the record. Recorded in the app · sample data

Rather click than read? Open the interactive demo: open RFI-212, turn it into CO #14, approve it and watch the budget and Pay App #9 update, on sample data in your browser.

05 · What's live today

Exactly what ships today.

Status comes from the app's own export, not from this page's copy. Live is in the product now; Preview is in the product with limits we document; Planned is not built yet.

  • LiveBiddingPackages, leveling, approved awards, buyout plans and commitments.
  • LiveBudgetBudget by cost code, Modifications for transfers, Budget Changes and a forecast.
  • LiveCommitmentsSubcontracts and POs with SOVs, CCOs and sub invoices with retainage.
  • LiveChange OrdersOwner change orders that revise the prime contract.
  • LiveAccounts PayableLien waiver and COI holds, joint checks, pay-when-paid aware payment runs.
  • LiveAccounts ReceivableGMP billing through the API with fee, cap and one GMP settlement.
  • LiveJob Cost ForecastJob cost entries linked to their GL lines; approved cost to complete.
  • LiveWork in Progress (WIP)Month-end WIP with an independent approver.

Where we don't fit yet

  • The GMP pay app built from job cost. Building the owner’s GMP pay app automatically from cost coded to the job, with its backup package, is planned, not built. Today GMP billing prices cost, fee and cap through the Accounting API, and the progress pay app works on screen.
  • Owner audit portal. Owners can see and pay invoices in the customer billing portal, but there is no portal for an owner’s auditor to browse cost backup.
  • Preconstruction estimating. There is no conceptual estimating, cost database or takeoff. The estimate comes in as the budget by cost code.
  • Project-side lien waiver log. Lien waiver holds are live in Accounts Payable. A project-level waiver log tied to the pay app is planned.
  • Native phone apps. Field tools run in the phone browser today. Native apps with offline capture are planned, not built.

Project tools and Accounting are live: they run in the product with documented limits. See the full list on the changelog and the platform overview.

06 · Trust

Your books, your data.

Permissions per tool

Permission templates set each tool to none, read only, standard or admin, enforced the same way in the app and the API.

MFA and SCIM

Authenticator-app sign-in for every user, and SCIM 2.0 provisioning from your identity provider.

Change history

Tracked changes record who changed which fields and when, shown as item history and in the activity feed.

Your data, exportable

Export lists to CSV and key records to PDF. Leaving should never mean losing your history.

REST API · 2,549 endpoints

Project and accounting records are available through the documented REST API, with OAuth tokens and signed webhooks for the tools you keep.

We don't hold SOC 2 or any other security certification today, and we won't imply that we do. Read exactly what is in place, or go straight to the API documentation.

07 · Questions

Common questions.

What is CM at risk software?

Software for a construction manager at risk to run a guaranteed maximum price contract: budget the GMP buckets, buy out trades, track contingency, take sub billing with compliance, and bill the owner cost plus fee up to the cap with backup that survives an audit.

How does os.construction bill a GMP contract?

Set the prime contract’s billing method to GMP. Through the Accounting API you send the period’s costs; Accounts Receivable prices the fee and checks the GMP cap against what AR already billed, then creates a draft invoice that follows normal approval. A contract gets one GMP settlement, with shared savings. There is no GMP billing screen yet.

How do I track contingency and buyout savings?

Record each move as a budget Modification with from line, to line, amount and a note. Buyout plans allocate each award against a captured budget snapshot, so the savings are visible against the line they came from.

Can it hold sub payments for missing lien waivers?

Yes, in Accounts Payable. Lien waiver mode decides which bills are held; a missing waiver, an expired certificate of insurance or a missing W-9 holds payment until resolved. This is general information, not legal advice; lien and waiver rules vary by state.

Is CM at risk the same as design-build?

No. In CM at risk the owner contracts the designer separately and the CM joins during design under a GMP. In design-build one firm holds design and construction. See the project delivery methods guide for the differences.

Is it live, and how do I try it?

Yes. Bidding, Budget, Commitments, Change Orders and Accounting are live. Start a 14-day free trial with no card; a sample project is already set up.

Run the GMP from buyout to settlement on one record.