CM at risk software for an open book under a cap.
As a CM at risk you bill the owner your cost plus a fee, up to a guaranteed maximum price, and the owner can audit every dollar. os.construction keeps buyout, subcontracts, sub billing, contingency moves and the owner bill on one data core, so the backup is the record itself.
14-day free trial. Pricing for paid plans isn't set yet.
How money moves under a GMP.
The cost of the work flows up from subcontracts and sub pay apps. The owner side bills that cost plus fee, checks it against the cap, and settles the savings at the end.
CM at risk billing and cost, line by line
| What | How it usually works | In os.construction |
|---|---|---|
| The GMP stack | Cost of the work, general conditions, contingency and fee, under a ceiling. Names and rules vary by agreement. | The budget holds cost codes for each bucket. The prime contract’s GMP billing method prices fee and the cap from what AR has already billed, through the Accounting API. |
| Buyout | Trade packages are bought out against the GMP budget; savings usually go to contingency or back to the owner, per the contract. | Bidding levels bids, records an approved award and creates the subcontract from awarded lines. A buyout plan allocates the award against a captured budget snapshot. |
| Contingency | The CM’s contingency is drawn by moving money into cost lines, and owners audit every move. | Budget Modifications record each transfer with from line, to line, amount and a note, and list every transfer on one tab. |
| Sub billing and compliance | Dozens of sub pay apps a month, each with retainage, insurance and lien waivers before payment. | Sub invoices bill on the commitment SOV with retainage. Accounts Payable holds payment for a missing lien waiver or expired certificate of insurance, and pays with joint checks when needed. |
| Shared savings and audit | At the end, unspent GMP is returned or split. The owner’s auditor wants each cost traced to its source. | One GMP settlement per contract, with shared savings priced by AR. Every job cost line links to the GL line and source record behind it. |
General information about common contract terms, not legal advice. Retainage, stored materials, lien and prevailing wage rules vary by contract and by state.
Where a GMP gets hard to defend.
- Failure 01
Contingency moves no one can explain
Contingency was drawn down in a spreadsheet over eighteen months. At the owner’s audit, nobody can show which transfer paid for what, or when.
- Failure 02
Buyout that never reached the budget
Trades were leveled and awarded in spreadsheets. Savings were promised to the owner, but the budget still shows the estimate and the commitments were retyped.
- Failure 03
The owner bill built by hand
Every month someone pulls sub pay apps, payroll and invoices, applies fee and insurance, checks the cap and assembles the backup binder. One missed lien waiver and the draw stalls.
Five workflows, one record.
Each step is a shipped workflow with a docs page or explainer. The GMP budget, buyout, subcontracts, payables and owner billing share one project and one set of cost codes.
- 01
Level, award and buy out
Release packages, level bids line by line with the lowest per line highlighted, record an award that a different admin approves, create the subcontract from the awarded lines, and allocate the award against a captured budget snapshot.
Answers failure 02Explainer: bidding to an awarded commitment → - 02
Record every contingency move
Move contingency into cost lines with a budget Modification: from line, to line, amount and note. The Modifications tab lists every transfer for the audit.
Answers failure 01Docs: budget → - 03
Take sub billing on the commitment
Sub invoices fill from the commitment’s SOV with This Period, Materials Stored and retainage per line, and move through review statuses to approval.
Answers failure 03Docs: commitments → - 04
Hold payment for waivers and insurance
Accounts Payable holds a bill for a missing lien waiver, an expired certificate of insurance or a missing W-9, supports joint checks, and is pay-when-paid aware in the payment run.
Answers failure 03Docs: Accounts Payable → - 05
Bill cost plus fee to the cap
Set the prime contract to GMP billing. Through the Accounting API, send the period’s costs and Accounts Receivable prices fee and the GMP cap from what was already billed into a draft invoice for approval.
Answers failure 03Docs: billing methods →
The budget, the change and the bill, in the app.
Real screens on sample data: the budget forecast by cost code, a change event with its chain, and the G702 summary of an owner pay app.



Rather click than read? Open the interactive demo: open RFI-212, turn it into CO #14, approve it and watch the budget and Pay App #9 update, on sample data in your browser.
Exactly what ships today.
Status comes from the app's own export, not from this page's copy. Live is in the product now; Preview is in the product with limits we document; Planned is not built yet.
- LiveBiddingPackages, leveling, approved awards, buyout plans and commitments.
- LiveBudgetBudget by cost code, Modifications for transfers, Budget Changes and a forecast.
- LiveCommitmentsSubcontracts and POs with SOVs, CCOs and sub invoices with retainage.
- LiveChange OrdersOwner change orders that revise the prime contract.
- LiveAccounts PayableLien waiver and COI holds, joint checks, pay-when-paid aware payment runs.
- LiveAccounts ReceivableGMP billing through the API with fee, cap and one GMP settlement.
- LiveJob Cost ForecastJob cost entries linked to their GL lines; approved cost to complete.
- LiveWork in Progress (WIP)Month-end WIP with an independent approver.
Where we don't fit yet
- The GMP pay app built from job cost. Building the owner’s GMP pay app automatically from cost coded to the job, with its backup package, is planned, not built. Today GMP billing prices cost, fee and cap through the Accounting API, and the progress pay app works on screen.
- Owner audit portal. Owners can see and pay invoices in the customer billing portal, but there is no portal for an owner’s auditor to browse cost backup.
- Preconstruction estimating. There is no conceptual estimating, cost database or takeoff. The estimate comes in as the budget by cost code.
- Project-side lien waiver log. Lien waiver holds are live in Accounts Payable. A project-level waiver log tied to the pay app is planned.
- Native phone apps. Field tools run in the phone browser today. Native apps with offline capture are planned, not built.
Project tools and Accounting are live: they run in the product with documented limits. See the full list on the changelog and the platform overview.
Your books, your data.
Permissions per tool
Permission templates set each tool to none, read only, standard or admin, enforced the same way in the app and the API.
MFA and SCIM
Authenticator-app sign-in for every user, and SCIM 2.0 provisioning from your identity provider.
Change history
Tracked changes record who changed which fields and when, shown as item history and in the activity feed.
Your data, exportable
Export lists to CSV and key records to PDF. Leaving should never mean losing your history.
REST API · 2,549 endpoints
Project and accounting records are available through the documented REST API, with OAuth tokens and signed webhooks for the tools you keep.
We don't hold SOC 2 or any other security certification today, and we won't imply that we do. Read exactly what is in place, or go straight to the API documentation.
Common questions.
What is CM at risk software?
Software for a construction manager at risk to run a guaranteed maximum price contract: budget the GMP buckets, buy out trades, track contingency, take sub billing with compliance, and bill the owner cost plus fee up to the cap with backup that survives an audit.
How does os.construction bill a GMP contract?
Set the prime contract’s billing method to GMP. Through the Accounting API you send the period’s costs; Accounts Receivable prices the fee and checks the GMP cap against what AR already billed, then creates a draft invoice that follows normal approval. A contract gets one GMP settlement, with shared savings. There is no GMP billing screen yet.
How do I track contingency and buyout savings?
Record each move as a budget Modification with from line, to line, amount and a note. Buyout plans allocate each award against a captured budget snapshot, so the savings are visible against the line they came from.
Can it hold sub payments for missing lien waivers?
Yes, in Accounts Payable. Lien waiver mode decides which bills are held; a missing waiver, an expired certificate of insurance or a missing W-9 holds payment until resolved. This is general information, not legal advice; lien and waiver rules vary by state.
Is CM at risk the same as design-build?
No. In CM at risk the owner contracts the designer separately and the CM joins during design under a GMP. In design-build one firm holds design and construction. See the project delivery methods guide for the differences.
Is it live, and how do I try it?
Yes. Bidding, Budget, Commitments, Change Orders and Accounting are live. Start a 14-day free trial with no card; a sample project is already set up.
Read, calculate, then try it.
From the blog
Free tools
Terms on this page: CM at risk · GMP · General conditions · Contingency · Allowance · Buyout · Buyout savings · Shared savings · Preconstruction · Lien waiver · Joint check
Run the GMP from buyout to settlement on one record.
Click through a change from RFI to pay app in the interactive demo, or start a 14-day free trial with a sample project already set up.