Construction lessons in a minute · 0:45

An RFI Answer Is Not the End of the Handoff

Check an RFI answer against its question and context, then confirm it reaches the affected field team.

An animated teaching example with AI narration. The illustrations explain the process; they are not a recording of the app.

Published · Illustrative examples · Watch on YouTube

Video transcript

The RFI has an answer. Is the field ready to move? Not until the answer reaches the work.

Picture a question about one corridor detail. First, check that the response answers that exact location and reference.

If it is incomplete, route the remaining question back instead of guessing.

Next, identify the applicable response and the people who need it. Connect it to the affected drawing or related record, then confirm the crew knows what changed.

Keep any separate approval requirements in place. An answered inbox is not a completed handoff. Explore the RFI workflow at os dot construction.