Construction lessons in a minute · 0:47

Which Submittal Revision Did They Actually Review?

Keep each submittal revision with its own review response. A newer file does not inherit an older approval.

An animated teaching example with AI narration. The illustrations explain the process; they are not a recording of the app.

Published · Illustrative examples · Watch on YouTube

Video transcript

Two files. Same submittal number. Different revisions. Which one did the reviewer actually see?

In this example, revision zero came back revise and resubmit.

The contractor prepares revision one. Keep the original response with revision zero, and send revision one through its own review. Do not copy the old outcome onto the new file.

Before anyone relies on the package, check three things together: the submittal number, the revision, and that revision's response.

Keep the earlier version available so the history still makes sense. A newer file is not automatically an approved file. Find the submittal guide at os dot construction.