Esc

↑↓ move↵ openIndex · Pagefind
Construction lessons in a minute · 0:43

A Close-Up Photo Can Hide the Most Important Detail

Pair detail evidence with a findable location and context so the next person can identify the same issue.

An animated teaching example with AI narration. The illustrations explain the process; they are not a recording of the app.

Published · Illustrative examples · Watch on YouTube

Video transcript

Here is a close-up of damaged paint. Useful photo, but where is it? A repair team should not have to search the building.

In this example, identify east wing, level two, room two fourteen, corridor side of the door. Then take an overview that shows the room marker and surrounding wall.

Pair it with the close-up showing the damage. Keep both images attached to the same issue and describe what needs checking.

Add the responsible person and a due date. Context helps someone find it; detail helps them understand it.

Find the observation guide at os dot construction.

Your next step

See it on one project record.

Explore the written guide, then open the sample project to see how construction records connect.

Try it in the app
Open file