Two Editors, One File: Make the Handoff Visible
Coordinate edit ownership, return the new version with a useful note, and verify the next person receives it.
An animated teaching example with AI narration. The illustrations explain the process; they are not a recording of the app.
Video transcript
Maya and Luis both edit the same delivery register. Which copy should the team use? Make the editing handoff visible.
In this example, Maya checks out version four while updating the delivery dates. Luis can see that the file is being worked on.
When finished, Maya checks it back in as version five with a clear note: updated three supplier delivery dates. The prior version stays in history.
Before Luis continues, he opens the returned version and checks the note. A locked file is not a finished handoff.
Return it, explain the change, and make the current copy clear. Find the documents guide at os dot construction.
Your next step
See it on one project record.
Explore the written guide, then open the sample project to see how construction records connect.
Try it in the app- Next · Construction lessons in a minuteA Close-Up Photo Can Hide the Most Important DetailWatch the next explainer
- GuideDocuments: check out, check in and version historyThe full written guide, with worked examples and sources.
- Video libraryMore in Construction lessons in a minuteEvery video, grouped by topic.