Allowance or Contingency? 💡 Know the Difference
A fixture allowance covers a named scope; contingency addresses uncertainty. Check inclusions, control and approval rules before using either.
An animated teaching example with AI narration. The illustrations explain the process; they are not a recording of the app.
Video transcript
This lobby needs lights, but the fixtures are not selected. Is that an allowance or contingency?
A ten-thousand-dollar fixture allowance carries an amount for that named scope. Check whether installation, freight, tax, and markup are included.
Contingency is a separate provision for uncertain costs and risks. Owner and contractor contingencies can cover different risks and have different controls.
Before using either, check the contract: what is covered, who controls it, and who must approve its use?
Name the purpose before moving the money. Find the allowance guide at os dot construction.