THE SOURCE DESK
Find the requirement.
Then check the edition.
A scheduling threshold only helps when you know where it came from. Use this directory to find the publisher, then match the document to your project.
Before you apply a rule
- Identify the incorporated document. Start with the executed contract, amendments, special provisions, and order of precedence.
- Record the edition and clause. A current web page may differ from the edition your contract incorporates.
- Read the applicability and exceptions. Note project category, units, approval routes, and any bracketed options.
- Keep the evidence. Record the source URL, document date, retrieval date, and the review decision in a specification matrix.
Publisher portals checked 2026-11-08. These are navigation references, not a certification that a clause applies to your project. Agency training and review guidance are not automatically contract terms.
State agencies
Alabama DOT ↗
Highway construction specifications and amendments.
Check: Match the specification edition and effective amendments to the letting and contract documents.
Arizona DOT ↗
Road and bridge specifications, stored specifications, and pay items.
Check: Read the contract special provisions alongside the applicable standard book; do not assume the newest posted book governs.
Caltrans ↗
Construction contract standards, specifications, and implementation notices.
Check: Confirm the edition and schedule bid item before applying a CPM requirement. The portal includes an implementation notice for 2026 standards.
Colorado DOT ↗
Construction specification editions and related guidance.
Check: Check the project advertisement and special provisions for the applicable schedule requirements.
Idaho Transportation Department ↗
Standard specification book, supplementals, and construction manuals.
Check: Keep the applicable supplemental specifications with the base book when assembling the review record.
Iowa DOT ↗
Specification guidance and access to the Electronic Reference Library.
Check: Record the ERL issue and the project-specific provisions; distinguish standard, supplemental, and developmental specifications.
Maryland State Highway Administration ↗
Standard and supplemental specifications with dated special provision inserts.
Check: Look for schedule and claims provisions in the incorporated contract, not only in a keyword search of the standard book.
Michigan DOT ↗
Construction guidance with links to specifications and construction scheduling.
Check: Use the scheduling resources and contract special provisions together; distinguish review guidance from contract obligations.
Minnesota DOT ↗
Standard specifications for construction and edition history.
Check: Confirm the applicable special provision and required schedule type before applying a CPM checklist.
New Jersey DOT ↗
Standard specification divisions for road and bridge construction.
Check: Read the project supplementary specifications and schedule submission requirements with the base specification.
New York State DOT ↗
Official electronic specifications with adoption dates.
Check: Identify the incorporated CPM item and type, then obtain the relevant scheduling guidance; a training guide is not a contract amendment.
PennDOT ↗
Publication 615, the agency scheduling manual.
Check: Confirm the revision and whether the procedure concerns design or construction; also check the construction contract requirements.
South Carolina DOT ↗
Highway construction specification editions and change information.
Check: Match the project to its incorporated edition before using schedule update or recovery requirements.
Tennessee DOT ↗
Construction special provisions and dated specification notices.
Check: Locate the applicable standard book and special provisions together; read the effective dates and obsolete-provision notices.
Texas DOT ↗
The 2024 standard specification book and related resources.
Check: Check contract items and special provisions for schedule type, updates, and supporting submissions; retain a record of the edition used.
Utah DOT ↗
Standard specifications, drawings, and special provisions by edition.
Check: Identify the applicable standard specification and project-specific revisions before selecting schedule review criteria.
Virginia DOT ↗
Road and bridge specifications, supplements, and prior editions.
Check: Confirm the contract schedule category and applicable special provision; do not carry clause numbers between categories.
Wisconsin DOT ↗
Standard specifications and updates for highway and structure construction.
Check: Record the contract edition and supplemental provisions before comparing a submission against schedule requirements.
Washington State DOT ↗
Road, bridge, and municipal construction specifications with revision history.
Check: Read the contract scheduling provision and required schedule type, along with amendments to the selected edition.
West Virginia Division of Highways ↗
Road and bridge specifications, archives, and publications.
Check: Confirm the contract schedule classification, incorporated edition, and project special provisions.
Federal guidance
GAO Schedule Assessment Guide ↗
GAO-16-89G explains practices for developing and assessing reliable schedules.
Check: Use it to structure a quality review; separately identify which requirements the contract incorporates.
UFGS: USACE Project Schedule ↗
Guide specification 01 32 01.00 10 for project schedules.
Check: Compare the guide with the issued project specification, including edited options and dates. A guide specification is a starting point for contract drafting.
UFGS: NAVFAC Cost-Loaded NAS ↗
Guide specification 01 32 17.00 20 for cost-loaded network analysis schedules.
Check: Keep this distinct from the USACE scheduling section and use the version incorporated into the project.
USACE ER 1-1-11 ↗
Official regulation directory: search for ER 1-1-11, Project Schedules.
Check: Distinguish agency schedule-management policy from the requirements actually included in a construction contract.
DCMA policy library ↗
Current policy publications, including earned value management surveillance.
Check: Do not present historical 14-point metrics as universal construction acceptance criteria or as proof of current agency policy.
FHWA state specification directory ↗
A starting point for locating specification publishers across the United States.
Check: Follow through to the state publisher and confirm the edition and contract applicability; directory links can change.
Professional guidance
AACE recommended practices ↗
Publisher library for recommended practices, including forensic schedule analysis.
Check: Obtain the relevant practice from the publisher under its access terms. Method selection still depends on the question and available records.
ASCE 67-17: Schedule Delay Analysis ↗
Publisher entry for the schedule delay analysis standard.
Check: Confirm the edition cited by the engagement or contract and use the licensed standard directly for detailed interpretation.
SCL Delay and Disruption Protocol ↗
The Society of Construction Law protocol, second edition, February 2017.
Check: Read its scope and the contract context. Guidance does not replace contract terms or jurisdiction-specific legal advice.
Turn a reference into a clear review comment
Write: “The imported file contains [condition] on [activity IDs]. The project specification [edition, clause] requires [your paraphrase]. Please provide [record or explanation] so the reviewer can resolve [question].” Keep the measured condition, requirement, and requested decision separate.