Workforce
ADP
Planned
Product-specific workforce mappings under evaluation.
Planned. This connection is not available in os.construction yet. This page describes the intended scope; it is not a release date.
Coverage by service or edition
Scope under evaluation. Each service needs its own permissions and acceptance checks.
ADP
Planned
Product-specific workforce mappings under evaluation.
Prepare for a scoped walkthrough
Use this checklist to agree the scope. These are preparation steps, not instructions for an available authorization or sync screen.
- Name the ADP product/use case; API entitlement, mutual TLS and OAuth.
- Confirm the destination company/project and the reviewer responsible for approving imported records.
Confirm the scope
Name the ADP product/use case; API entitlement, mutual TLS and OAuth.
Agree the mapping
Product/tenant/associateOID → worker reference; exact fields require the product contract.
Preview and reconcile
Keep source identity/revisions separate from locally owned permissions, project placement and workflow decisions. Unresolved associations or conflicting local edits require review.
Review before applying
An authorized reviewer must confirm destination scope, unresolved records and control totals. A successful extraction is not proof that data has been applied.
Check recovery and access
Pause on expired or revoked access. Restore authorization before resuming from the last complete checkpoint. An incomplete list or permission error is not proof of deletion; inspect uncertain outcomes before retrying.
Mapping and synchronization
- Record mapping
Product/tenant/associateOID → worker reference; exact fields require the product contract.
- Sync boundary
- Workers v2 paging is product-specific; events/deletions/retention need validation.
- Source ownership
- The provider remains authoritative for its source records. Local project placement, access and workflow decisions need explicit destination ownership. Match by scoped IDs, not names alone.
- Outbound policy
- No provider business writes are offered here. Sending, posting, inviting, deleting and permission changes require separately approved capabilities.
Conflicts and recovery
When records disagree
Keep source identity/revisions separate from locally owned permissions, project placement and workflow decisions. Unresolved associations or conflicting local edits require review.
When a run stops
Pause on expired or revoked access. Restore authorization before resuming from the last complete checkpoint. An incomplete list or permission error is not proof of deletion; inspect uncertain outcomes before retrying.
Limits to plan around
- No payroll execution, employee changes or bank/tax data in the proposed scope.
- Not available in os.construction yet. Provider documentation describes the upstream API, not an os.construction connection.
No provider connection is initiated from this page. For the reviewed accounting import workflow available today, see the accounting import guide.
Documentation and source dates
Provider documentation establishes upstream capabilities, not os.construction availability. Confirm the current edition and API contract before planning setup.
- ADP official documentationAccessed