Margin fade is the erosion of a job's projected gross margin over its life: bid at 11%, now forecast at 6%, that is 5 points of fade. The opposite, a margin that grows, is called gain.

Fade almost never arrives as a surprise on one day. It accumulates in places a monthly report does not look closely: a cost-to-complete that was never updated, change work performed but not yet priced, productivity running behind the estimate, or a sub's overrun that has not been invoiced yet. Then late in the job, when the budget runs out on a code, the whole thing lands at once.

Fade caught at 30% complete is a conversation with the owner, the sub or your own crew. Fade found at 90% complete is a write-down. The difference is how honestly cost-to-complete is updated every month.

Watching fade across your whole portfolio matters too. Sureties and lenders look at the pattern: a company whose jobs consistently fade is telling them its estimates or project controls are off, regardless of how any single job ends.

Do it · Calculator

Estimate at completion calculator

Start from the defaults and note the fade in points. Raise cost to date to $2,900,000 while keeping 58% complete, and note how far the fade moves. Then ask: which cost code on a real job of yours would produce a jump like that, and when would you have seen it?

Open the calculator

Check yourself

Three questions, instant feedback. Get all three right to check off this lesson.

Q1A job bid at 12% margin now projects 8%. The fade is:

Q2Which is a common hidden source of fade?

Q3Why do sureties care about fade across all jobs?

0 of 3 correct