Cost & accounting · 2:50

Log a potential change as a change event

Capture a possible cost change as a change event, mark its scope, add a rough line item, and check the saved record before pricing moves forward.

Published · Sample data · Watch on YouTube

Each step in a few seconds

Short silent loops cut from the walkthrough. Scroll sideways for every step.

  1. Step 1 of the walkthrough, Start a new change event, in the sample project.
    Step 1Start a new change event · sample data, no sound
  2. Step 2 of the walkthrough, Name the possible change, in the sample project.
    Step 2Name the possible change · sample data, no sound
  3. Step 3 of the walkthrough, Mark the scope, in the sample project.
    Step 3Mark the scope · sample data, no sound
  4. Step 4 of the walkthrough, Describe what happened, in the sample project.
    Step 4Describe what happened · sample data, no sound
  5. Step 5 of the walkthrough, Choose a cost code for the line, in the sample project.
    Step 5Choose a cost code for the line · sample data, no sound
  6. Step 6 of the walkthrough, Add a rough line item, in the sample project.
    Step 6Add a rough line item · sample data, no sound
  7. Step 7 of the walkthrough, Enter a rough amount, in the sample project.
    Step 7Enter a rough amount · sample data, no sound
  8. Step 8 of the walkthrough, Create the change event, in the sample project.
    Step 8Create the change event · sample data, no sound
  9. Step 9 of the walkthrough, Check the saved line item, in the sample project.
    Step 9Check the saved line item · sample data, no sound

Chapters

  1. 0:00 Start a new change event
  2. 0:31 Name the possible change
  3. 0:50 Mark the scope
  4. 1:19 Describe what happened
  5. 1:33 Choose a cost code for the line
  6. 1:56 Add a rough line item
  7. 2:09 Enter a rough amount
  8. 2:21 Create the change event
  9. 2:32 Check the saved line item

Video transcript

Here we are on the New Change Event page in our local sample project. A change event is where we note a possible change early, before anyone prices or approves it. Let's log one together.

First, we give it a title that says what changed. Our example is added fire sealant at corridor penetrations. The demo adds a unique reference so each recording creates its own sample record.

Next, we set Scope. For this sample we choose Out of Scope, which tells the team we believe the work sits outside the current contract. Pick whatever your team has actually agreed.

In Description, we explain what happened and why it may cost money. Our sample says the inspector asked for extra fire sealant at corridor penetrations that aren't shown on the drawings.

Now let's add a line item. We start with the cost code, because a line needs one to be saved. For this sample we use General Requirements; choose the code your team actually tracks this work against.

In the Line Items section, we type a short description of the work. One line is enough to start, and we can refine it later.

Then we enter a rough amount for that line. It's an early estimate, not an approved price, and we can refine it later.

Now we select Create Change Event. The app saves it and opens the detail page with its number and our title in the header.

Here's the change event we created. The header shows the Open status and the Out of Scope tag, and our new line appears in Line Items with its rough amount. We have logged the possible change, marked its scope, and recorded a first estimate, so pricing can move forward from here.