Bidding
- PATCH
/rest/v1.0/bidding/recipient/{id}Submit or decline a bid through a scoped invitation - GET
/rest/v1.0/bidding/recipient/{id}/addendum_acknowledgmentsShow current reviewed addendum and this recipient's retained acknowledgment history - POST
/rest/v1.0/bidding/recipient/{id}/addendum_acknowledgmentsAcknowledge the exact current reviewed addendum before submitting a quote - GET
/rest/v1.0/bidding/recipient/{id}/submission_receiptsList only this authenticated invitation's immutable quote revisions - POST
/rest/v1.0/projects/{project_id}/bid_packagesCreate Bid Package - GET
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/addendum_acknowledgmentsList retained bidder acknowledgments of reviewed package addenda; staff only - PATCH
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/awardAward a submitted, reconciled bid - GET
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/award_recommendationsList retained staff award recommendations and independently approved current decision - POST
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/award_recommendationsPropose a reasoned selection against an exact fresh quote comparison - POST
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/award_recommendations/{recommendation_id}/approveIndependently approve the exact current recommendation; Bidding administrator only - POST
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/award_recommendations/previewPreview exact current frozen quotes for a staff award recommendation - GET
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bid_forms/{bid_form_id}/bid_levelingBid leveling across a bid form - GET
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bidsList Bids within a Bid Package - POST
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bidsInvite vendors to a bid package - GET
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}Show Bids within a Bid package - PATCH
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}Update a Bid from a Bid Package - GET
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}/buyout_planRead the immutable approved vendor buyout plan - POST
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}/buyout_planApprove an immutable vendor buyout plan after preview review - POST
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}/buyout_plan/previewPreview private vendor buyout allocations against a captured Budget snapshot - GET
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}/commitment_receiptRead the private immutable award to commitment source receipt - GET
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}/submission_receiptsList immutable quote revisions for one bidder; staff only - POST
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/create_commitmentCreate or recover a private draft commitment from the award - GET
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/releaseRead the current vendor package release and paginated immutable release history - POST
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/releaseApprove a vendor-visible bid package release from an exact short-lived review - GET
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/release/attachmentsList classified attachment evidence for one vendor package, including retained withdrawals - POST
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/release/attachmentsClassify a verified private upload for a draft vendor package - DELETE
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/release/attachments/{attachment_id}Withdraw a classified attachment from future vendor releases while retaining evidence - GET
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/release/attachments/{attachment_id}/downloadInspect exact classified attachment bytes before approving a vendor release - POST
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/release/previewPreview the exact vendor-visible bid package before a reviewed release - GET
/rest/v1.0/projects/{project_id}/bid_packages/{id}Show Bid Package - PATCH
/rest/v1.0/projects/{project_id}/bid_packages/{id}Update Bid Package - GET
/rest/v1.1/projects/{project_id}/bid_packagesList Bid Packages
/rest/v1.0/bidding/recipient/{id}Submit or decline a bid through a scoped invitation
Parameters
- idintegerpathrequired
- x-bid-invitation-tokenstringheaderrequired
Request body
- actionstringrequired
- request_keystring (uuid)
- bidobject
Response · 200 · object
- okbooleanrequired
/rest/v1.0/bidding/recipient/{id}/addendum_acknowledgmentsShow current reviewed addendum and this recipient's retained acknowledgment history
Parameters
- idintegerpathrequired
- x-bid-invitation-tokenstringheaderrequired
- pageintegerquery
- per_pageintegerquery
Response · 200 · object
- addendumBidAddendumCurrent | stringrequired
- acknowledgmentsBidAddendumAcknowledgment[]required
- totalintegerrequired
/rest/v1.0/bidding/recipient/{id}/addendum_acknowledgmentsAcknowledge the exact current reviewed addendum before submitting a quote
Parameters
- idintegerpathrequired
- x-bid-invitation-tokenstringheaderrequired
Request body
- release_version_idintegerrequired
- release_sha256stringrequired
- request_keystring (uuid)required
Response · 201 · BidAddendumAcknowledgment
- idintegerrequired
- company_idintegerrequired
- project_idintegerrequired
- bid_package_idintegerrequired
- invitation_idintegerrequired
- recipient_user_idintegerrequired
- release_version_idintegerrequired
- release_sha256stringrequired
- source_sha256stringrequired
- changed_fieldsBidAddendumChangedField[]required
- acknowledged_atstring (date-time)required
/rest/v1.0/bidding/recipient/{id}/submission_receiptsList only this authenticated invitation's immutable quote revisions
Parameters
- idintegerpathrequired
- x-bid-invitation-tokenstringheaderrequired
- pageintegerquery
- per_pageintegerquery
Response · 200 · object
- receiptsBidSubmissionReceiptRecipient[]required
- totalintegerrequired
/rest/v1.0/projects/{project_id}/bid_packagesCreate Bid Package
Parameters
- project_idstringpathrequired
Request body
- bid_packageobjectrequired
Response · 201 · object
- accept_post_due_submissionsboolean
- accounting_methodstring
- allow_bidder_sumboolean
- project_currency_iso_codestring
- project_currency_displaystring
- anticipated_award_datestring (date)
- bidding_countdown_email_daysinteger
- bid_docs_manifestobject
- bid_due_datestring (date-time)
- bid_email_messagestring
- bid_emails_include_link_to_bidding_documentsboolean
- bid_submission_confirmationstring
- bid_web_messagestring
- blind_biddingboolean
- created_byobject
- distribution_membersobject[]
- display_project_nameboolean
- bid_form_sections_enabledboolean
- flexible_response_types_enabledboolean
- distribution_member_idsinteger[]
- enable_countdown_emailsboolean
- enable_prebid_rfi_deadlineboolean
- enable_prebid_walkthroughboolean
- has_any_bid_invitedboolean
- has_bids_sent_ndaboolean
- has_no_nda_activityboolean
- nda_invited_bids_with_activity_countinteger
- attachments_zip_streaming_urlstring
- hiddenboolean
- idinteger
- linksobject
- lump_sum_biddingboolean
- managerobject
- nda_attachmentsobject[]
- numberinteger
- openboolean
- release_requiredboolean
- vendor_revisioninteger
- point_of_contactobject
- point_of_contact_login_idinteger
- pre_bid_rfi_deadline_datestring (date-time)
- pre_bid_walk_through_datestring (date-time)
- pre_bid_walk_through_notesstring
- project_idinteger
- project_image_urlstring
- project_logo_namestring
- project_logo_urlstring
- project_latitudestring
- project_locationstring
- project_longitudestring
- project_namestring
- require_ndaboolean
- sealedboolean
- show_bid_infoboolean
- submitted_bids_countinteger
- titlestring
- enable_public_discoveryboolean
- primary_slug_with_idsstring
- pre_bid_meeting_locationstring
- pre_bid_meeting_datestring (date-time)
- pre_bid_meeting_online_linkstring
- pre_bid_meeting_notesstring
- public_project_funding_sourcestring
- show_location_for_nda_projectsboolean
- public_bid_opening_details_datestring (date-time)
- public_bid_opening_details_locationstring
- public_bid_opening_details_online_linkstring (uri)
- trades_and_servicesobject[]
- business_classificationsobject[]
- lock_unit_fields_base_bidboolean
- lock_quantity_fields_base_bidboolean
- lock_unit_fields_alternatesboolean
- lock_quantity_fields_alternatesboolean
- has_pdm_documentsboolean
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/addendum_acknowledgmentsList retained bidder acknowledgments of reviewed package addenda; staff only
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
- pageintegerquery
- per_pageintegerquery
Response · 200 · object
- acknowledgmentsBidAddendumAcknowledgment[]required
- totalintegerrequired
- current_version_totalintegerrequired
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/awardAward a submitted, reconciled bid
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
Request body
- bid_idintegerrequired
Response · 200 · object
- idinteger
- statusstring
- bidsobject[]
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/award_recommendationsList retained staff award recommendations and independently approved current decision
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
- pageintegerquery
- per_pageintegerquery
Response · 200 · object
- currentBidAwardRecommendation | stringrequired
- recommendationsBidAwardRecommendation[]required
- totalintegerrequired
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/award_recommendationsPropose a reasoned selection against an exact fresh quote comparison
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
Request body
- bid_idintegerrequired
- source_sha256stringrequired
- reasonstringrequired
- request_keystring (uuid)required
- scope_exceptionsstring[]
- alternates_notestring
- qualifications_notestring
- schedule_notestring
- cost_code_notestring
- selected_cost_code_idsinteger[]
Response · 201 · BidAwardRecommendation
- idintegerrequired
- company_idintegerrequired
- project_idintegerrequired
- bid_package_idintegerrequired
- release_version_idintegerrequired
- selected_bid_idintegerrequired
- selected_receipt_idintegerrequired
- statusstringrequired
- source_sha256stringrequired
- source_snapshotBidAwardComparisonSnapshotrequired
- review_sha256stringrequired
- review_snapshotBidAwardReviewSnapshotrequired
- proposer_idintegerrequired
- proposal_reasonstringrequired
- proposed_atstring (date-time)required
- approver_idintegerrequired
- approval_reasonstringrequired
- approved_atstring (date-time)required
- superseded_atstring (date-time)required
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/award_recommendations/{recommendation_id}/approveIndependently approve the exact current recommendation; Bidding administrator only
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
- recommendation_idintegerpathrequired
Request body
- source_sha256stringrequired
- reasonstringrequired
- request_keystring (uuid)required
Response · 200 · BidAwardRecommendation
- idintegerrequired
- company_idintegerrequired
- project_idintegerrequired
- bid_package_idintegerrequired
- release_version_idintegerrequired
- selected_bid_idintegerrequired
- selected_receipt_idintegerrequired
- statusstringrequired
- source_sha256stringrequired
- source_snapshotBidAwardComparisonSnapshotrequired
- review_sha256stringrequired
- review_snapshotBidAwardReviewSnapshotrequired
- proposer_idintegerrequired
- proposal_reasonstringrequired
- proposed_atstring (date-time)required
- approver_idintegerrequired
- approval_reasonstringrequired
- approved_atstring (date-time)required
- superseded_atstring (date-time)required
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/award_recommendations/previewPreview exact current frozen quotes for a staff award recommendation
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
Request body
- bid_idintegerrequired
Response · 200 · BidAwardRecommendationPreview
- source_sha256stringrequired
- release_version_idintegerrequired
- selected_receipt_idintegerrequired
- snapshotBidAwardComparisonSnapshotrequired
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bid_forms/{bid_form_id}/bid_levelingBid leveling across a bid form
Parameters
- project_idstringpathrequired
- bid_package_idstringpathrequired
- bid_form_idstringpathrequired
Response · 200 · object
- bid_package_idintegerrequired
- accounting_methodstring
- low_totalnumber
- low_total_bid_idsinteger[]
- columnsobject[]required
- base_bid_sectionobjectrequired
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bidsList Bids within a Bid Package
Parameters
- pageintegerquery
- per_pageintegerquery
- project_idstringpathrequired
- bid_package_idstringpathrequired
Response · 200 · object[]
- idinteger
- bid_package_idinteger
- bid_package_titlestring
- bid_form_titlestring
- bid_form_idinteger
- bid_statusstring
- awardedboolean
- company_idinteger
- invitation_last_sent_atstring (date-time)
- is_bidder_committedboolean
- lump_sum_amountnumber (float)
- lump_sum_enabledboolean
- submittedboolean
- created_atstring (date-time)
- updated_atstring (date-time)
- due_datestring (date-time)
- bidder_commentsstring
- bid_requesterobject
- vendorobject
- projectobject
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bidsInvite vendors to a bid package
Parameters
- project_idstringpathrequired
- bid_package_idstringpathrequired
Response · 201 · object[]
- idinteger
- bid_package_idinteger
- bid_package_titlestring
- bid_form_titlestring
- bid_form_idinteger
- bid_statusstring
- awardedboolean
- company_idinteger
- invitation_last_sent_atstring (date-time)
- is_bidder_committedboolean
- lump_sum_amountnumber (float)
- lump_sum_enabledboolean
- submittedboolean
- created_atstring (date-time)
- updated_atstring (date-time)
- due_datestring (date-time)
- bidder_commentsstring
- bid_requesterobject
- vendorobject
- projectobject
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}Show Bids within a Bid package
Parameters
- idintegerpathrequired
- project_idstringpathrequired
- bid_package_idstringpathrequired
Response · 200 · object
- idinteger
- bid_package_idinteger
- bid_package_titlestring
- bid_form_titlestring
- awardedboolean
- bidders_can_add_line_itemsboolean
- bid_statusstring
- company_idinteger
- invitation_last_sent_atstring (date-time)
- is_bidder_committedboolean
- lump_sum_amountnumber (float)
- lump_sum_enabledboolean
- submittedboolean
- created_atstring (date-time)
- updated_atstring (date-time)
- due_datestring (date-time)
- bidder_commentsstring
- show_bid_in_estimatingboolean
- bid_amountstring (currency)
- bid_requesterobject
- deleted_atstring (date-time)
- bidder_notesstring
- attachments_countinteger
- recipient_idsinteger[]
- recipient_listobject[]
- recipient_list_with_email_and_numberstring[]
- mailtostring
- bidder_inclusionstring
- bidder_exclusionstring
- bid_convertible_to_subcontractboolean
- bid_convertible_to_purchase_orderboolean
- contract_button_disabled_reasonstring
- po_button_disabled_reasonstring
- linksobject
- vendorobject
- projectobject
- bid_itemsobject[]
- cost_codesobject[]
- attachmentsobject[]
- attachments_zip_streaming_urlstring
- values_converted_by_namestring
- values_converted_atstring (date-time)
- values_modified_by_namestring
- values_modified_atstring (date-time)
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}Update a Bid from a Bid Package
Parameters
- idintegerpathrequired
- project_idstringpathrequired
- bid_package_idstringpathrequired
Request body
- bidobject
Response · 200 · object
- idinteger
- bid_package_idinteger
- bid_package_titlestring
- bid_form_titlestring
- awardedboolean
- bidders_can_add_line_itemsboolean
- bid_statusstring
- company_idinteger
- invitation_last_sent_atstring (date-time)
- is_bidder_committedboolean
- lump_sum_amountnumber (float)
- lump_sum_enabledboolean
- submittedboolean
- created_atstring (date-time)
- updated_atstring (date-time)
- due_datestring (date-time)
- bidder_commentsstring
- show_bid_in_estimatingboolean
- bid_amountstring (currency)
- bid_requesterobject
- deleted_atstring (date-time)
- bidder_notesstring
- attachments_countinteger
- recipient_idsinteger[]
- recipient_listobject[]
- recipient_list_with_email_and_numberstring[]
- mailtostring
- bidder_inclusionstring
- bidder_exclusionstring
- bid_convertible_to_subcontractboolean
- bid_convertible_to_purchase_orderboolean
- contract_button_disabled_reasonstring
- po_button_disabled_reasonstring
- linksobject
- vendorobject
- projectobject
- bid_itemsobject[]
- cost_codesobject[]
- attachmentsobject[]
- attachments_zip_streaming_urlstring
- values_converted_by_namestring
- values_converted_atstring (date-time)
- values_modified_by_namestring
- values_modified_atstring (date-time)
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}/buyout_planRead the immutable approved vendor buyout plan
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
- idintegerpathrequired
Response · 200 · object
No documented fields.
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}/buyout_planApprove an immutable vendor buyout plan after preview review
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
- idintegerpathrequired
Request body
- snapshot_idintegerrequired
- allocationsobject[]required
- review_tokenstringrequired
- request_keystring (uuid)
Response · 200 · object
No documented fields.
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}/buyout_plan/previewPreview private vendor buyout allocations against a captured Budget snapshot
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
- idintegerpathrequired
Request body
- snapshot_idintegerrequired
- allocationsobject[]required
Response · 200 · object
No documented fields.
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}/commitment_receiptRead the private immutable award to commitment source receipt
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
- idintegerpathrequired
Response · 200 · object
- idintegerrequired
- project_idintegerrequired
- bid_package_idintegerrequired
- bid_idintegerrequired
- vendor_idintegerrequired
- commitment_typestringrequired
- commitment_idintegerrequired
- awarded_amountstringrequired
- source_sha256stringrequired
- source_snapshotobjectrequired
- created_by_idintegerrequired
- created_atstring (date-time)required
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/bids/{id}/submission_receiptsList immutable quote revisions for one bidder; staff only
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
- idintegerpathrequired
- pageintegerquery
- per_pageintegerquery
Response · 200 · object
- receiptsBidSubmissionReceiptStaff[]required
- totalintegerrequired
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/create_commitmentCreate or recover a private draft commitment from the award
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
Request body
- bid_idintegerrequired
- commitment_typestring
- fallback_cost_code_idinteger
Response · 200 · object
- commitment_idintegerrequired
- commitment_typestringrequired
- createdbooleanrequired
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/releaseRead the current vendor package release and paginated immutable release history
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
- pageintegerquery
- per_pageintegerquery
Response · 200 · object
- currentobjectrequired
- versionsobject[]required
- totalintegerrequired
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/releaseApprove a vendor-visible bid package release from an exact short-lived review
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
Request body
- review_tokenstringrequired
- request_keystringrequired
- reasonstringrequired
Response · 200 · object
- idintegerrequired
- company_idintegerrequired
- project_idintegerrequired
- bid_package_idintegerrequired
- package_revisionintegerrequired
- versionintegerrequired
- addendum_ack_requiredbooleanrequired
- reviewed_by_idintegerrequired
- reasonstringrequired
- snapshot_sha256stringrequired
- snapshotBidPackageVendorSnapshotrequired
- approved_atstring (date-time)required
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/release/attachmentsList classified attachment evidence for one vendor package, including retained withdrawals
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
- pageintegerquery
- per_pageintegerquery
Response · 200 · object
- attachmentsBidPackageReleaseAttachment[]required
- totalintegerrequired
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/release/attachmentsClassify a verified private upload for a draft vendor package
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
Response · 200 · BidPackageReleaseAttachment
- idintegerrequired
- bid_package_idintegerrequired
- namestringrequired
- content_typestringrequired
- size_bytesintegerrequired
- sha256stringrequired
- classificationstringrequired
- classification_reasonstringrequired
- scan_modestringrequired
- created_by_idintegerrequired
- created_atstring (date-time)required
- removed_atstring (date-time)required
- removed_by_idintegerrequired
- removal_reasonstringrequired
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/release/attachments/{attachment_id}Withdraw a classified attachment from future vendor releases while retaining evidence
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
- attachment_idintegerpathrequired
Request body
- reasonstringrequired
Response · 200 · BidPackageReleaseAttachment
- idintegerrequired
- bid_package_idintegerrequired
- namestringrequired
- content_typestringrequired
- size_bytesintegerrequired
- sha256stringrequired
- classificationstringrequired
- classification_reasonstringrequired
- scan_modestringrequired
- created_by_idintegerrequired
- created_atstring (date-time)required
- removed_atstring (date-time)required
- removed_by_idintegerrequired
- removal_reasonstringrequired
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/release/attachments/{attachment_id}/downloadInspect exact classified attachment bytes before approving a vendor release
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
- attachment_idintegerpathrequired
Response · 200 · string (binary)
No documented fields.
/rest/v1.0/projects/{project_id}/bid_packages/{bid_package_id}/release/previewPreview the exact vendor-visible bid package before a reviewed release
Parameters
- project_idintegerpathrequired
- bid_package_idintegerpathrequired
Response · 200 · object
- review_tokenstringrequired
- expires_atstring (date-time)required
- snapshot_sha256stringrequired
- package_revisionintegerrequired
- snapshotBidPackageVendorSnapshotrequired
/rest/v1.0/projects/{project_id}/bid_packages/{id}Show Bid Package
Parameters
- project_idstringpathrequired
- idstringpathrequired
Response · 200 · object
- accept_post_due_submissionsboolean
- accounting_methodstring
- allow_bidder_sumboolean
- project_currency_iso_codestring
- project_currency_displaystring
- anticipated_award_datestring (date)
- bidding_countdown_email_daysinteger
- bid_docs_manifestobject
- bid_due_datestring (date-time)
- bid_email_messagestring
- bid_emails_include_link_to_bidding_documentsboolean
- bid_submission_confirmationstring
- bid_web_messagestring
- blind_biddingboolean
- created_byobject
- distribution_membersobject[]
- display_project_nameboolean
- bid_form_sections_enabledboolean
- flexible_response_types_enabledboolean
- distribution_member_idsinteger[]
- enable_countdown_emailsboolean
- enable_prebid_rfi_deadlineboolean
- enable_prebid_walkthroughboolean
- has_any_bid_invitedboolean
- has_bids_sent_ndaboolean
- has_no_nda_activityboolean
- nda_invited_bids_with_activity_countinteger
- attachments_zip_streaming_urlstring
- hiddenboolean
- idinteger
- linksobject
- lump_sum_biddingboolean
- managerobject
- nda_attachmentsobject[]
- numberinteger
- openboolean
- release_requiredboolean
- vendor_revisioninteger
- point_of_contactobject
- point_of_contact_login_idinteger
- pre_bid_rfi_deadline_datestring (date-time)
- pre_bid_walk_through_datestring (date-time)
- pre_bid_walk_through_notesstring
- project_idinteger
- project_image_urlstring
- project_logo_namestring
- project_logo_urlstring
- project_latitudestring
- project_locationstring
- project_longitudestring
- project_namestring
- require_ndaboolean
- sealedboolean
- show_bid_infoboolean
- submitted_bids_countinteger
- titlestring
- enable_public_discoveryboolean
- primary_slug_with_idsstring
- pre_bid_meeting_locationstring
- pre_bid_meeting_datestring (date-time)
- pre_bid_meeting_online_linkstring
- pre_bid_meeting_notesstring
- public_project_funding_sourcestring
- show_location_for_nda_projectsboolean
- public_bid_opening_details_datestring (date-time)
- public_bid_opening_details_locationstring
- public_bid_opening_details_online_linkstring (uri)
- trades_and_servicesobject[]
- business_classificationsobject[]
- lock_unit_fields_base_bidboolean
- lock_quantity_fields_base_bidboolean
- lock_unit_fields_alternatesboolean
- lock_quantity_fields_alternatesboolean
- has_pdm_documentsboolean
/rest/v1.0/projects/{project_id}/bid_packages/{id}Update Bid Package
Parameters
- project_idstringpathrequired
- idstringpathrequired
Request body
- bid_packageobjectrequired
Response · 200 · object
- accept_post_due_submissionsboolean
- accounting_methodstring
- allow_bidder_sumboolean
- project_currency_iso_codestring
- project_currency_displaystring
- anticipated_award_datestring (date)
- bidding_countdown_email_daysinteger
- bid_docs_manifestobject
- bid_due_datestring (date-time)
- bid_email_messagestring
- bid_emails_include_link_to_bidding_documentsboolean
- bid_submission_confirmationstring
- bid_web_messagestring
- blind_biddingboolean
- created_byobject
- distribution_membersobject[]
- display_project_nameboolean
- bid_form_sections_enabledboolean
- flexible_response_types_enabledboolean
- distribution_member_idsinteger[]
- enable_countdown_emailsboolean
- enable_prebid_rfi_deadlineboolean
- enable_prebid_walkthroughboolean
- has_any_bid_invitedboolean
- has_bids_sent_ndaboolean
- has_no_nda_activityboolean
- nda_invited_bids_with_activity_countinteger
- attachments_zip_streaming_urlstring
- hiddenboolean
- idinteger
- linksobject
- lump_sum_biddingboolean
- managerobject
- nda_attachmentsobject[]
- numberinteger
- openboolean
- release_requiredboolean
- vendor_revisioninteger
- point_of_contactobject
- point_of_contact_login_idinteger
- pre_bid_rfi_deadline_datestring (date-time)
- pre_bid_walk_through_datestring (date-time)
- pre_bid_walk_through_notesstring
- project_idinteger
- project_image_urlstring
- project_logo_namestring
- project_logo_urlstring
- project_latitudestring
- project_locationstring
- project_longitudestring
- project_namestring
- require_ndaboolean
- sealedboolean
- show_bid_infoboolean
- submitted_bids_countinteger
- titlestring
- enable_public_discoveryboolean
- primary_slug_with_idsstring
- pre_bid_meeting_locationstring
- pre_bid_meeting_datestring (date-time)
- pre_bid_meeting_online_linkstring
- pre_bid_meeting_notesstring
- public_project_funding_sourcestring
- show_location_for_nda_projectsboolean
- public_bid_opening_details_datestring (date-time)
- public_bid_opening_details_locationstring
- public_bid_opening_details_online_linkstring (uri)
- trades_and_servicesobject[]
- business_classificationsobject[]
- lock_unit_fields_base_bidboolean
- lock_quantity_fields_base_bidboolean
- lock_unit_fields_alternatesboolean
- lock_quantity_fields_alternatesboolean
- has_pdm_documentsboolean
/rest/v1.1/projects/{project_id}/bid_packagesList Bid Packages
Parameters
- pageintegerquery
- per_pageintegerquery
- viewstringquery
- filterstringquery
- with_flagsstring[]query
- sortstringquery
- filters[bid_due_date]string (date)query
- filters[status]stringquery
- filters[created_at]stringquery
- filters[has_bid_forms]booleanquery
- project_idstringpathrequired
Response · 200 · object[]
- idinteger
- project_idinteger
- bid_due_datestring (date-time)
- created_atstring (date-time)
- numberinteger
- titlestring
- release_requiredboolean
- vendor_revisioninteger
- submitted_bids_countinteger