# Closeout and TCO checklist

**Project:** ______________________  
**Permit #:** ______________________  
**Owner:** ______________________  
**Architect:** ______________________  
**Building department / AHJ:** ______________________  
**Target substantial completion:** ______________________  
**TCO expiry date:** ______________________  
**Final completion target:** ______________________  

## 1 · Plan the TCO and CO (60 to 90 days out)

- [ ] Pre-final meeting held with the building department; final inspection list and outside agencies confirmed in writing (Done / N/A): ___
- [ ] Contract checked: is a TCO or a final CO a condition of substantial completion? (Done / N/A): ___
- [ ] Each final inspection added to the schedule as an activity, with lead time for re-inspection (Done / N/A): ___
- [ ] Fire alarm acceptance and sprinkler final booked with the fire marshal (Done / N/A): ___
- [ ] Elevator inspection and certificate booked with the elevator authority, if applicable (Done / N/A): ___
- [ ] Special inspection final reports and structural observation letters requested from the engineers (Done / N/A): ___
- [ ] Owner told who applies for the TCO and CO, and which fees, deposits or bonds the jurisdiction requires (Done / N/A): ___

## 2 · TCO application

- [ ] Areas to be occupied defined on a plan: floors, tenant spaces or phases (Done / N/A): ___
- [ ] Life safety complete in those areas: fire alarm, sprinklers, exits, exit signs, emergency lighting (Done / N/A): ___
- [ ] Fire-rated separation and secure barriers between occupied areas and active work (Done / N/A): ___
- [ ] Fire department access, hydrants, addressing and key box in place (Done / N/A): ___
- [ ] Required sign-offs for the occupied areas passed (building, fire, electrical, plumbing, mechanical, elevator) (Done / N/A): ___
- [ ] Design professional letters or certifications submitted, where the jurisdiction asks for them (Done / N/A): ___
- [ ] Open-items list with completion dates attached to the application (Done / N/A): ___
- [ ] TCO received; its conditions and expiry date logged and put on the schedule as a milestone (Done / N/A): ___
- [ ] Renewal lead time noted: the date to apply for an extension if the final CO will not be ready (Done / N/A): ___
- [ ] Owner’s insurance, utilities and security in place for the occupied areas (Done / N/A): ___

## 3 · Substantial completion

- [ ] Contractor’s own punch walk completed and list submitted (Done / N/A): ___
- [ ] Architect / owner punch list received and every item assigned to one trade with a due date (Done / N/A): ___
- [ ] Certificate of Substantial Completion signed (often AIA G704), with the time to finish the listed items (Done / N/A): ___
- [ ] Date confirmed for liquidated damages, warranty start and retainage reduction (Done / N/A): ___
- [ ] Responsibility for security, maintenance, utilities and insurance transferred in writing (Done / N/A): ___

## 4 · Commissioning (Cx)

- [ ] Test, adjust and balance (TAB) report submitted (Done / N/A): ___
- [ ] Functional performance tests complete and witnessed by the commissioning authority (Done / N/A): ___
- [ ] Controls sequences verified and trend data provided where the specification requires it (Done / N/A): ___
- [ ] Cx issues log closed, or deferred and seasonal tests listed with dates (Done / N/A): ___
- [ ] Owner training sessions held, with attendance and recordings filed (Done / N/A): ___
- [ ] Commissioning report or systems manual delivered (Done / N/A): ___

## 5 · Final inspections and certificate of occupancy

- [ ] All final inspections passed and sign-off cards or reports collected (Done / N/A): ___
- [ ] Outside agency approvals received (health, public works, utilities, zoning), where required (Done / N/A): ___
- [ ] Final certificate of occupancy issued before the TCO expired (Done / N/A): ___
- [ ] Copy of the CO given to the owner and posted where the jurisdiction requires (Done / N/A): ___
- [ ] Final punch items verified closed by the architect or owner (Done / N/A): ___

## 6 · Turnover documents

- [ ] As-built drawings submitted, with every field change and RFI answer shown (Done / N/A): ___
- [ ] Operation and maintenance manuals submitted, organized by spec section (Done / N/A): ___
- [ ] Warranties and guarantees collected from every trade and manufacturer, with start dates (Done / N/A): ___
- [ ] Attic stock and spare parts delivered against a signed receipt (Done / N/A): ___
- [ ] Keys, access cards and combinations turned over against a signed receipt (Done / N/A): ___
- [ ] Test reports and certificates filed: fire alarm, sprinkler, backflow, elevator (Done / N/A): ___

## 7 · Final payment and retainage release

- [ ] All pending change orders approved, rejected or withdrawn; sub change orders match owner change orders (Done / N/A): ___
- [ ] Final subcontractor pay apps received and back charges settled (Done / N/A): ___
- [ ] Conditional final lien waivers collected from every sub and supplier (Done / N/A): ___
- [ ] Affidavit of payment of debts and claims (often AIA G706) and lien releases (G706A or state forms) (Done / N/A): ___
- [ ] Consent of surety to final payment (often AIA G707), on bonded jobs (Done / N/A): ___
- [ ] Final owner pay app with retainage release submitted and certified (Done / N/A): ___
- [ ] Unconditional final waivers exchanged once funds clear (Done / N/A): ___
- [ ] Notice of completion recorded, in states that use one (Done / N/A): ___
- [ ] Retainage paid to subs under the subcontract terms; warranty-period reminders set (Done / N/A): ___

## How to use it

1. Start section 1 two to three months before substantial completion. Final inspections and the TCO depend on outside schedules you don’t control.
2. Read the contract’s definition of substantial completion first. If it requires a TCO or CO, the inspection and TCO sections are on your critical path.
3. Give every line an owner and a date. N/A is an answer; a blank is not.
4. Put the TCO expiry on the schedule as a milestone with a renewal date ahead of it. An expired TCO can leave an occupied building out of compliance.
5. Collect turnover documents from the first pay app, not the last. Section 6 is where closeout usually stalls.
6. Don’t submit the final pay app until section 7’s waivers and consent of surety are in hand. Owners and lenders will send it back.

Template by os.construction: https://os.construction/resources/templates/closeout-checklist. Sample rows are illustrative; your contract and specifications govern.