53 project apps · 19 Accounting apps · one OS Construction has an operating system now.

Run the job and the company: project management, project Financials and company Accounting, with apps for billing, payables, payroll and close. One platform, with access scoped to the work.

14-day free trial, no card. Have an account? Sign in

Illustration on sample data: on the Riverside Medical Center project, one record moves through six apps. A daily log at 06:10 reports missing fire dampers, RFI-212 asks the architect, the schedule adds the work, change order 14 for $86,400 is approved, budget line 23-330 takes $78,100 of cost, and Pay App #9 bills $69,120 of it.

Play Stack the OS

Every app is a floor. Stack all 72.

The crane swings each os.construction app over the tower. Drop it square on the record below. Overhang gets cut off. Miss completely and it gets re-keyed by hand, like it would be anywhere else.

  • 72apps to stack
  • 1record under all of them
  • 0your best

On the hookBudget

Tap the site, click, or press Space to drop. Land it square for a plumb drop.

Your project lives in six places.

One record. Every app.

Six copies. Six versions of the truth.

Follow the $86,400. Right now it reads five ways.

CO #14 · $86,400 · entered once, the same in every app

The proof

Your tools don't talk. Your people do the talking.

One change order. Six systems. Every handoff is a re-key, and every re-key is a chance for the number to drift. Race it.

Same , fused back into one record. Approve it once.

Lane A · Today Day 1 10:42 · standing by
Tap to approve. Watch both worlds update.
Lane B · os.construction 0.00 s standing by
Lane A

Today: 6 tools, 0 connections

    0Re-keys
    0People
    0Errors
    Lane B

    os.construction: 1 record

    CO #14 · from RFI-212Fire dampers, Level 3 · $86,400
    Pending

    Done. The team is already on the next RFI.

    0Re-keys
    0People
    0Errors
    The verdict

    Same change order. 9 days vs 0.4 sec.

    Start free trial →
    StepTodayos.construction
    Until every system agrees~9 days0.4 sec
    Re-keys50
    People touching one number61
    Errors introduced30
    Where the truth lives6 copies1 record

    Illustrative · sample data · Riverside Medical Center, Job #24-118

    The data core

    Enter it once. Every app knows.

    Projects, project Financials, company Accounting, Insights, CRM and planned AI agents share one platform. Accounting is its own company module, with apps for the ledger, payables, receivables, banking, payroll, WIP and close.

    The  posts once: budget 23-330 takes +$78,100 cost, plus $8,300 markup.

    00Data coreOne data model under everything01ProjectsField, RFIs, submittals, logs02FinancialsBudgets, commitments, billing03InsightsLive WIP, forecasts, dashboards04AI AgentsBack-office workforce

    Explore company Accounting →

    00 · Data coreSimulated · sample data

    Entered once. Used everywhere.

      One recordCO #14Fire dampers · RFI-212$86,400
      • ProjectsLinked to RFI-212
      • FinancialsBudget 23-330 +$78,100 cost
      • InsightsMargin forecast re-run
      • BillingAdded to Pay App #9 draft

      Entered once. Used everywhere.

      Open CO #14 in the 3D model

      Next · The storyThat’s the core. Now watch one job run on it, start to finish.

      The story · Riverside Medical Center

      One job.
      Four acts.

      Follow one sample job from first inquiry to the margin report. Every act hands its numbers to the next: a slip in the schedule becomes a cost in the books and a dip on the dashboard.

      Case file REC-2291 → Job #24-118Sample data · one record · four modules
      1. WinCRM $48.2MInquiry → won → Job #24-118
      2. PlanScheduling +6 daysFinish day 71 · baseline 65
      3. BookAccounting $85,500Extended general conditions
      4. SeeAnalytics 11.4%Margin · slip −0.17 pts

      Or scroll. Slip an activity in Act II and watch Acts III and IV re-price it.

      Act I · Win the work · CRM · Live

      Win the work.
      Start the job.

      Every lead pours into one funnel. Watch Riverside ride it from a website inquiry to a $48.2M win, then become the job on the same record. Drag it down the funnel, or mark it Won.

      Pipeline funnel · sample dataSample data 1 / 5
      Inquiries
      Qualify 25%
      Site visit 40%
      Proposal 60%
      Won
      REC-2291
      Riverside Medical Center
      OwnerArchitect
      Weighted pipeline$0.0M
      Win rate0%
      Avg sales cycle0 days
      Open pursuits0

        Drag the card to another stage, or press the arrow keys or Enter to move it.

        Sample data · fictional pursuitsExplore CRM
        Next Act II · Plan it
        Act II · Plan it · Scheduling + CPM

        Slip a day.
        See the ripple.

        A live critical path, calculated as you watch. Tap any activity to slip it four days. Float absorbs it, or the finish moves.

        Riverside Medical · Job #24-118· sample network · won in Act I

        FinishDay 65
        Variance0d
        Critical7 of 10

        Auto demo

          Watch: two slips, two very different outcomes.

          • Critical path
          • Has float
          • Float
          • Baseline
          • Slip
          Explore Scheduling
          Scheduling + CPM · Live

          A schedule you
          can defend.

          Checked against Primavera P6. Grade the logic, simulate the finish, and show why any date is where it is.

          • 156/160Dates match P6P6 23.12 cross-validation fixture
          • 14DCMA checksEach with its threshold and source
          • 87.6%Values agree with P626,337 values · 39 real exports
          • 30,000Activities per planXER or P6 XML, up to 32 MiB
          1 / 6

          Grade the logic before the owner does.

          B
          DCMA grade83.310 of 12 runnable checks pass · 2 skipped

          Offenders open straight in the Planner, or export to CSV. A screening indicator, not a compliance verdict: the basis travels with every grade.

          1. 01Logic6.1%
          2. 02Leads0%
          3. 03Lags3.2%
          4. 04FS share93.4%
          5. 05Hard constraints1.4%
          6. 06High float8.0%
          7. 07Negative float0%
          8. 08High duration2.4%
          9. 09Invalid dates0%
          10. 10Resourcesskipped
          11. 11Missed tasks3.9%
          12. 12Critical path testpass
          13. 13CPLIskipped
          14. 14BEI0.971

          • Activities, WBS and calendars
          • FS · SS · FF · SF with lags and leads
          • P6 constraints and progress modes
          • Layouts for you, the project or the company
          • Filter builder, Group & Sort and 44 columns
          • Activity Details with codes, UDFs and steps
          • Activity Network and Trace Logic
          • Timescales, bar styles and three baseline bars
          • A progress line on screen and in print
          • Fill down, Excel paste and Global Change
          • Excel round-trip and layout files
          • Progress Spotlight and a schedule log
          • Touch Gantt that follows your layout
          • Offline field mode with conflict-checked sync
          • Assignments view and Resource Usage
          • Store Period Performance and EV columns
          • Line of Balance and takt plans
          • Last Planner weekly plans and PPC
          • Activity discussion with @mentions
          • Change feed and rebase after a conflict
          • Feedback, WPs & Docs and Expenses tabs
          • WBS window and several projects open at once
          • Three-point risk and a risk register
          • Update checks, review and submittals
          • Portfolio and program calculation
          • Twelve reports, a print Gantt and scheduled emails
          • Named baselines and version diffs
          • Cost loading and leveling proposals
          • XER and P6 XML import and export
          • Update, Insert, Keep or Delete on import
          • Lean loading for 30,000-activity plans
          • Auto, Days or Minutes time precision
          • Open ends and resource-dependent work as P6
          • Suspend, resume and expected finish as P6
          • P6 leveling options and priorities
          • Six EV techniques and five ETC options
          • Cost accounts mapped to cost codes
          • P6 .plf layout import
          • Cross-project leveling
          • MIP 3.5, prospective TIA and pacing
          • Weather risk by region and month
          • Company template library and lessons learned
          ILLUSTRATIVE SCHEDULE · NO LIVE PROJECT DATAExplore Scheduling ↗
          Next Act III · Book it
          Act III · Book it · Accounting · Live

          One change.
          Every ledger.

          Follow one field change through the books: change order, commitment, a sub bill held for its lien waiver, the pay app, WIP, cash and close. Every entry balances. Press the button and post it yourself.

          From Act II · 6-day slip → $85,500 of extended general conditions

          Riverside Medical · Job #24-118 · sample books Act II slip · +6 days · $85,500 1 / 10
          Contract$49.21M
          Est. cost$43.60M
          Cost to date$31.63M
          Billed$30.69M
          Under billed$5.01M
          Margin11.40%
          Field · RFI-212Fire dampers, L3 corridorSix rated penetrations need fire dampers. The answer becomes CO #14.
          Field change—

          No entry. A question from the field is not a cost.

          Debits $0Credits $0

          ✓ Balanced · DR = CR · posted

            Approvals move the budget. Only balanced entries move the ledger.Explore Accounting
            Act IV · See it · Analytics BI · Live

            See the fade
            while it’s fixable.

            Every record your teams already keep feeds one governed catalog of metrics. Riverside’s margin slide shows up in spring, not at year-end.

            From Act III · $85,500 posted to job cost · 6-day slip

            Riverside Medical #24-118 · sample dataSample data 1 / 4 Records in
            Riverside Medical · est. gross marginMonth-end snapshots
            View as
            Goal ≥ 12.5% · On track

            Sep includes 6-day slip · +$85,500 GCs · −0.17 pts

            Alert sent · below goal at May month-end

            Explain this number · Sep month-end
            Contract, COs #1–14
            $49,300,000
            − Est. cost at completion
            $43,679,800
            cost to date $31.7M + cost to complete $11.98M
            incl. 6-day slip: +$85,500 general conditions
            = Est. gross profit
            $5,620,200
            ÷ contract
            11.4%

            From the prime contract, approved change orders, job cost and the PM forecast by cost code.

            —Job financials aren’t in this role’s permissions.
            Blank, never zero.
            Est. margin11.4%Sep snapshot
            Est. gross profit$5.62Mof $49.3M
            Open RFIs234 overdue
            Portfolio3 of 14jobs losing margin

            Every number drills to its records.Explore Analytics
            Next the same OS on the jobsite
            The field

            The same OS on the jobsite.

            Every act of that story started on a site. On a phone the OS becomes a home screen of apps. The super logs it once at 06:10; the PM, the budget and the owner see the same record before the coffee is cold.

            • Daily log & photosCrews, weather, deliveries and notes, with photos on the record.
            • Punch & inspectionsChecklists and punch items that close themselves out.
            • Incidents & observationsSafety reports that roll up to your OSHA 300 log.
            • Drawings & specsThe current set, on site, in the same app as the RFI.

            Runs in any phone browser, nothing to install, and the schedule’s field mode works offline. A native app and offline capture for the other field tools are Planned.

            Riverside Medical · #24-118Good morning, Sam
            22crew on site2inspections4open punch
            Up next · sample data

            10:00Above-ceiling inspection, L3

            RFI-212Waiting on the architect

            Try it · tap any app · sample data

            1. Change anything on the phone: it lands on the same record, everywhere.

            Next · The appsSame record, every tool. Meet the rest of the apps.

            The apps · that was four of them

            72 apps. One operating system.

            CRM, schedule, ledger and analytics were four. Here is every other tool you run a company on: 53 project apps and 19 Accounting apps, all on one record, one permission model and one API.

            • Core Tools 12
            • Project Management 25
            • Financial Management 13
            • Preconstruction 3
            • Accounting 19

            Opens CO #14 in a tool. In the wall, the arrow keys move between tools and Enter shows the record in that tool.

            • Analytics
            • Documents
            • Directory
            • Tasks
            • Admin
            • Automations
            • Project Archive
            • Activity
            • API Docs
            • Notifications
            • Webhooks
            • Jobs
            • Emails
            • RFIs
            • Submittals
            • Action Plans
            • Inspections
            • Observations
            • Coordination Issues
            • Correspondence
            • Incidents
            • Conversations
            • Equipment
            • Punch List
            • Workforce Planning
            • Materials
            • Timesheets
            • Meetings
            • Models
            • Schedule
            • Daily Log
            • Photos
            • Drawings
            • Permits
            • Specifications
            • Forms
            • Transmittals
            • Prime Contracts
            • Purchase Requests
            • Expense Reports
            • Budget
            • Direct Costs
            • Commitments
            • Change Orders
            • T&M Tickets
            • Payment Applications
            • RFQs
            • Change Events
            • Owner Reports
            • Work Breakdown Structure
            • CRM
            • Bidding
            • Prequalification
            • Chart of Accounts
            • Journal Entries
            • General Ledger
            • Approvals
            • Accounts Payable
            • Accounts Receivable
            • Banking
            • Payroll
            • Job Cost Forecast
            • Work in Progress (WIP)
            • Fixed Assets
            • Leases
            • Trial Balance
            • Financial Reports
            • Fiscal Periods
            • Foreign Currency
            • Accounting Imports
            • Accounting Settings
            • Accounting Access
            • PlannedModel coordination+
            • PlannedAI agents
            One record

            RFI-212 becomes CO #14 becomes a pay app line. No copies.

            One permission model

            Roles set once for your team, owners and subs. MFA, SCIM, audit log.

            One API

            2549 REST endpoints, 2549 implemented. Build on it ↓

            Accounting tiles are company apps with separate permissions. A tile that isn't live yet says so; dashed tiles are planned. See the road ahead ↓

            AI agents · Planned · not in the product yet

            Agents do the work. You sign off.

            Planned: agents that know cost codes, retainage and AIA billing, working on the same record your team already uses in os.construction. Scroll from field to pay app: the field logs it, agents draft it, a person approves every step.

            By the pay app cutoff the $86,400 bills itself: SOV line 10 on Pay App #9, $69,120 (80% installed and stored).

            Riverside Medical Center · Job #24-118 06:00 Day 1 · Field to books
            0Re-keys
            1Systems
            0Approvals
            0.0Hrs back*
            Superintendent

            Logs a hidden condition from the field.

            No fire dampers above the L3 corridor ceiling. Photo and note, done.

            06:10 NO DAMPER · L3
            Photo · L3 Daily log 1 record
            RFI Agent Agent

            Drafts RFI-212 with photos and spec refs.

            The PM reads it and sends it in one tap.

            RFI-212Drafted by agent
            Missing fire dampers · L3 corridor Spec 23 33 00 · §2.4 Drawing M-301 2 photos · 1 note Send to architectSent · 08:31
            Architect → PM

            The answer lands. PM converts it to CO #14.

            Priced from the RFI. Nothing re-keyed.

            Architect · 11:45Provide dampers per 23 33 00. Proceed.
            ↓ convert
            CO #14from RFI-212
            $86,400 Sub · Summit Mech.$68,000 Labor + firestop$10,100 Markup$8,300
            Owner

            Approves CO #14 from their phone.

            Live today: budget, commitments and forecast update in the same instant.

            Approve CO #14Approved
            Budget+$78.1K Commit.CCO-03 Forecast11.4% BillingQueued
            Billing Agent Agent
            23 days later · pay app cutoff

            Bills CO #14 on Pay App #9.

            Installed and stored by cutoff: 80% of CO #14 bills on Pay App #9.

            Pay App #9G702 / G703
            Work this period$2,241,280 + CO #14 · line 10 (80%)$69,120 This period$2,310,400 Retainage 10%−$231,040
            Apex Steel · waiver requested CoreDry · waiver requested
            Controller / CFO

            Opens a live WIP. No month-end rebuild.

            Margin 11.4% on Riverside. Fade flagged on 3 jobs.

            Projected margin · 24-11811.4%
            14 active jobs · sampleWIP 24-118 Riverside · fade−1.8 pts 23-207 Northgate · fade−0.9 pts 24-031 Cedar Park · gain+0.3 pts
            Night shift Agents

            Agents work the overnight queue.

            Every action logged and held for a human to approve.

            Agent queueOvernight
            1. Coded 12 invoices to cost codes
            2. Matched AP to commitments
            3. Risk scan · 1 flag: INV-4471
            4. Drafted Monday owner report
            Project Manager

            The morning briefing is waiting.

            3 approvals · 1 risk · everything else done.

            Morning briefing06:00
            12 coded invoices Monday owner report Pay App #9 to owner INV-4471 over PO-118

            *Illustrative · sample data · agents are Planned

            The workforce we're building 6 agents · Planned

            Human approval on every actionAudit trail (live today)Your data stays yours

            • AP AgentCodes every invoice to job and cost code. Matches POs and commitments.
            • Billing AgentBuilds the pay app: SOV, retainage, lien waivers, G702/G703.
            • Risk AgentWatches every job for fade, overruns and schedule slip.
            • RFI AgentTurns field notes into RFIs, with photos and spec refs attached.
            • Compliance AgentChases COIs, lien waivers and safety docs before they lapse.
            • Reporting AgentDrafts owner reports, WIP and closeout packages for a person to approve.

            Bring your own agent · MCP + CLI · PreviewYour AI drafts. You decide.

            Plug in Claude, ChatGPT, Cursor or your own bot through the MCP connector or the osc command line. It reads what your login can read and drafts the next step. Then it stops: approving, posting, paying, sending and deleting are refused, and a person finishes the job.

            • PreviewLocal MCP connector: npx -y @os-construction/cli mcp
            • Previewosc CLI, on npm as @os-construction/cli
            • PreviewHosted MCP at app.os.construction/mcp, read-only
            • PlannedBuilt-in agents above
            01Your assistant
            02Give it a job
            os.construction DRAFT APPROVE PEOPLE ONLY MCP READY !
            Pick an assistant and a job Then watch what an agent can and cannot do.

            Rivet, our stand-in for your agent · simulated session · Riverside sample data

            Under the hood real tool calls

            Credential Personal token Read + write
            Scope this call needs none yet
            • company
            • project
            • record
            Audit trail
            1. Waiting for the first API call
            agent session · simulated

            Simulated session with Riverside sample data. The tool names, commands, operation IDs, scopes and the refusal message are the real ones. Today the connector runs on your computer from the @os-construction/cli npm package with a personal token from Account > AI assistants; the hosted connection (paste a URL, sign in, read-only during the preview) is rolling out now. The six agents above remain Planned.

            Developers

            It's an OS. Build on it.

            The apps your team uses are the API you call. Read and write the same RFIs, budgets and pay apps, with the same permissions, over REST.

            2549
            REST endpoints in the reference
            2549
            implemented today
            72
            apps across project tools and Accounting
            • OAuth bearer tokens with per-tool scopes
            • SCIM 2.0 provisioning, MFA, audit log
            • CSV and PDF exports. Your data stays yours
            • Importer to bring projects from your previous system
            • Webhook subscriptions and signed test deliveries
            • MCP connector and osc CLI for your own AI agents and scripts (developer preview)

            Read the API docsQuickstart →

            09 · The road ahead

            The road ahead
            is a job site.

            Why os.construction exists, what’s paved and open today, what the crew is building now and where the stakes are set. Statuses come from the same product data as our status page. No dates we can’t keep.

            1. Groundbreaking

              Why it exists

              Six systems, five re-keys of every change order, and numbers that drift between them. We started with one foundation instead.

              • A change order gets typed into the PM tool, accounting, the billing spreadsheet, the owner report and the BI deck.

                For a GC: every re-key is a chance for the budget, the subcontract and the pay app to disagree, and someone spends month-end finding out which one is right.

                The integration math
              • Projects, financials, company accounting, CRM and analytics read one record.

                For a GC: approve the change once and every view that depends on it moves with it. No exports between your own systems.

                How one data core works
            2. Paved · Live today

              What you can use today

              Finished and open to traffic. Every item here is Live in the product: a trial user can use it in their own workspace without asking us.

              • RFIs, submittals, drawings, specs, daily logs, photos, punch, inspections and meetings.

                For a GC: the super logs it from a phone browser and the PM sees it on the same record that prices the change.

                Project management
              • A native CPM planner with a P6-validated engine, P6 import and export, look-aheads and Last Planner weekly plans.

                For a GC: the schedule lives next to cost, so a slip can be read against the budget instead of in a separate file.

                Scheduling guide
              • Budget, commitments, change events, change orders and G702/G703-style pay apps on one record.

                For a GC: approve CO #14 once and the budget, the subcontract and the next pay app update with it.

                Project financials
              • Cost-plus and GMP contracts billed from approved billing terms, with GMP and not-to-exceed caps enforced.

                For a GC: cost-of-work draws come from job cost instead of a spreadsheet rebuilt every month, and the cap is checked before the owner sees it.

                Owner billing on GMP jobs
              • Monthly owner, GMP cost and executive reports from live project data, with frozen versions, a branded PDF and expiring share links.

                For a GC: the monthly owner package starts filled in from cost, billing, change orders, schedule and photos. You write the narrative and publish.

                Owner Reports guide
              • 19 accounting apps: general ledger, payables, receivables, banking, payroll, job cost, WIP and close.

                For a GC: WIP and over/under billings come from the same records the job runs on, not a month-end export.

                Company accounting
              • From the first inquiry through proposal, bidding, the won project and warranty service.

                For a GC: a won pursuit becomes the project with its contacts and history attached, so nobody re-enters the job.

                Construction CRM
              • Dashboards, earned value, goals, alerts, a WIP view and the weekly Project Story.

                For a GC: fade shows up while there is still time to act, because the dashboard reads the live record.

                Analytics
              • 2549 REST endpoints, webhooks with retries and replay, and service accounts for integrations.

                For a GC: your integrations run on their own service account instead of borrowing a person’s login, and react to events instead of polling.

                Developer docs
              • Per-tool permissions, MFA, SCIM provisioning, an audit log and CSV/PDF export.

                For a GC: owners and subs get exactly the tools you grant, and your data leaves whenever you want it to.

                Security
              • Daily logs, photos, observations, RFIs and punch from a phone browser.

                For a GC: no app store rollout for the crew: a link and a login. Native apps are further down the road.

                Field tools on phones
            3. Work zone · Preview

              What the crew is building now

              It works, with limits we state, or it is being turned on with assisted onboarding. Each item says what isn’t done yet.

              • Connect Claude, ChatGPT, Cursor or VS Code with a personal token. Agent credentials can read and propose, never approve.

                For a GC: ask your own AI assistant about the job and get answers from the real record. Not yet: the hosted connection URL, and the CLI runs from a source checkout.

                Connect an AI assistant
              • Consent, refresh rotation, revocation and a Connected apps page for each user.

                For a GC: third-party tools ask your people for access instead of sharing passwords, and an admin can revoke it. Not yet verified end to end with a third-party app in production.

                Authentication
              • Connect HubSpot and QuickBooks Online from Admin, and import a project from another PM system with a dry run first.

                For a GC: bring history in without a services project. Imports are reviewed before anything posts, and nothing is written back to the source.

                Connections
              • Retainage per line and released in Project Financials, compared with Accounting’s AR and retainage tie-outs.

                For a GC: retainage held on the pay app and retainage on the books are checked against each other.

                Pay apps, SOV and retainage
            4. Surveyed · Planned

              Where the stakes are set

              Not available yet. It may change, be delayed or never ship, and we never count it as part of the product.

              • Agents that draft routine PM and finance work on live job data, with a person approving every action.

                For a GC: the routine drafting moves to an agent and your team keeps the sign-off. Not built yet.

                How agents would work
              • Phone and tablet apps that capture without signal and sync later.

                For a GC: basements and remote sites stop being dead zones. Today the web app works in phone browsers, and the schedule has an offline field mode.

                Offline capture (planned)
              • Sign in through your identity provider. SCIM provisioning is already live.

                For a GC: one company login and offboarding in one place.

                Planned list
              • Lien waiver requirements generated from the owner pay app. AP waiver holds are already live.

                For a GC: the waivers the owner needs this draw would be listed for you instead of chased by memory.

                Lien waiver tracking
              • Cost-loaded project cash curves and a fade-versus-bid view in Analytics.

                For a GC: see the job’s cash need and its margin against the bid on one chart. Accounting already has a 13-week cash forecast.

                Analytics
              • Autodesk Construction Cloud, Salesforce, DocuSign, Trimble Vista, NetSuite and more.

                For a GC: the tools you keep stay in the loop. Each connector page says what is available and what is planned.

                Integrations
            5. The horizon · Vision

              Where the road goes

              Direction, not a commitment. It isn’t on the Planned list yet, and people approve. Always.

              • Accruals, WIP and reconciliations prepared overnight, ready for sign-off. Fade and lien exposure flagged before they hit.

                For a GC: month-end becomes a review, not a rebuild. The page below is a simulated demo, not a product feature.

                Watch a simulated overnight close
              • A digital twin tied to the ledger, with equipment and sensor data updating progress and job cost.

                For a GC: click a floor and see what it cost, what’s billed and what’s left. Today this is an interactive concept.

                Explore the twin concept
            Survey crew wanted

            Drive the next stake.

            Vote for what we pave next, or tell us what we missed. Founding contractors help decide the order, and we read every one.

            Pave next (pick any)

            Every job. Every dollar. One OS.

            Founding program: open

            Start today

            Break ground today.

            Start a 14-day free trial with a sample project ready to explore. Invite your team when you’re ready.

            Want a say in what ships first? The founding program adds a direct line to the team.

            14-day free trial, no card. Pricing for paid plans isn’t set yet; talk to us. Have an account? Sign in.

            That was our job. Try it on your own numbers

            Charley ForeyBuilt by Charley Forey, who has spent ten years connecting construction software. Read why

            • Shape the roadmap
            • Pricing before you commit
            • A direct line to the team
            Answers

            Questions, answered.

            Straight answers about what's live, what's next and who it's for.

            os.construction — answers
            • One operating system for construction. Today: project management and project financials on a single data model: RFIs, submittals, drawings, documents, permits, daily logs, change orders, budgets, commitments and pay apps. A change order logged from the field updates the budget, the commitment and the pay app from the same record. Company Accounting is separate; AI agents are planned, on the same core.

            • General contractors and specialty contractors, from the super and PM to the controller and CFO, plus owners who want to see the job without waiting for a report. If your team re-keys data between PM software, accounting and a WIP spreadsheet, start with a free trial on the sample project.

            • Most contractors run the job in one system and the books in another, with an integration in between. os.construction puts project management and project financials on one record today: the change order logged in the field is the budget change, the commitment change and the line on the pay app. Company Accounting is a separate area for the ledger, payables, receivables, banking and payroll; Financials covers each project.

            • Partly, today. os.construction can import project records with a dry run. Company Accounting supports reviewed CSV journal and opening trial-balance imports; control-account balances and dimensions require separate workflows. Tell us your stack and we’ll help assess what moves.

            • Planned. Agents aren’t in the product yet. When they ship, they’ll do the busywork on your real data: coding invoices, drafting change orders, chasing lien waivers, assembling pay apps. They’ll propose; a person approves every action, and every step lands in the same audit log your team’s changes already write to. Today, in developer preview, an MCP connector and the osc CLI let your own AI assistant call the API with your permissions: set it up.

            • You own your data. Export lists to CSV and key documents to PDF any time, or pull everything through the REST API. Access is per project and per tool (none, read only, standard, admin), sign-in supports authenticator-app MFA, company admins can provision users over SCIM, and changes on supported tools are written to an audit log. We don’t hold SOC 2 or ISO certifications today. Details: /security.

            • It runs in the browser on phones, tablets and laptops: daily logs, RFIs, punch lists, photos and drawings from the jobsite. The schedule’s field mode works offline; there’s no native app and no offline capture for the other field tools yet, both Planned. If your crews work without signal, tell us.

            • Project financials are live: prime contracts and schedule of values, budget with forecasting and snapshots, commitments (subcontracts and POs), change events to change orders, pay applications with retainage. Company Accounting includes AP, AR, the general ledger and payroll. Banking, job cost, WIP snapshots, assets, leases, reporting and close are also part of the module. AR reconciliation and WIP posting are implemented. Validate opening balances and historical source coverage before cutover. Follow the workflows →

            • Yes. A REST API with OAuth bearer tokens, scoped access and paginated responses covers the project tools and Accounting. Webhooks are live, with signed deliveries. See /developers.

            • Today. Start a 14-day free trial; your workspace comes with a sample project. Pricing isn’t set yet, and we’ll share it before anyone commits.

            • A direct line to the team, working sessions on your real workflows, a say in what ships next (accounting enhancements, agents, imports), and pricing shared before you commit.

            Start free trial
            ESC
            ↑↓ navigate↵ run / asktab follow-upsesc close